26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

85<br />

83<br />

81<br />

79<br />

77<br />

75<br />

73<br />

Elevation (ft)<br />

71<br />

69<br />

67<br />

65<br />

0 100 200 300 400 500 600 700 800 900 1000 1100 1200<br />

Station (feet)<br />

As Built Existing<br />

Figure 10. The longitudinal pr<strong>of</strong>ile <strong>of</strong> <strong>the</strong> reach <strong>of</strong> Young Creek located within <strong>the</strong> State L<strong>and</strong>s Restoration Project. The survey was<br />

completed be<strong>for</strong>e (2002; existing) <strong>and</strong> after (2003; post-construction) project completion. The station (longitudinal location measured<br />

at <strong>the</strong> channel thalweg) begins at <strong>the</strong> upstream boundary <strong>of</strong> <strong>the</strong> project. The as built stream channel was approximately 250 feet<br />

longer due to <strong>the</strong> increased me<strong>and</strong>er frequency that resulted from constructing <strong>the</strong> new stream channel.<br />

143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!