Table 7. Mean cross sectional area, bankfull width, depth, maximum bankfull depth, <strong>and</strong> width to depth ratio measured <strong>for</strong> 4 riffles in<br />
<strong>the</strong> existing stream channel <strong>and</strong> 10 riffles in <strong>the</strong> stream channel shortly after construction in <strong>the</strong> fall <strong>of</strong> 2003 (as built) <strong>for</strong> <strong>the</strong> Young<br />
Creek State L<strong>and</strong>s Stream Restoration Project. Variance estimates <strong>for</strong> annual mean values are presented in paren<strong>the</strong>ses. Mean values<br />
between treatments were compared using a t-test, <strong>and</strong> <strong>the</strong> one tailed p-value <strong>for</strong> each comparison is presented. The percent change <strong>for</strong><br />
each parameter between treatments is also presented.<br />
Riffle Cross<br />
Sections<br />
Cross<br />
Sectional Area<br />
(ft 2 )<br />
Mean Bankfull<br />
Width (ft)<br />
Mean Bankfull<br />
Depth (ft)<br />
Maximum Bankfull<br />
Depth (ft)<br />
Width to Depth<br />
Ratio<br />
Existing 16.75 (1.58) 27.88 (22.73) 0.60 (0.008) 1.05 (0.017) 48.3 (239.6)<br />
As Built (2003) 21.99 (10.07) 16.3 (9.18) 1.24 (0.05) 1.985 (0.09) 13.7 (21.2)<br />
Percent Change 31.3% -41.5% 107.5% 89.0% -71.6%<br />
t-test P Value 0.004 6.6*10-5 7.5*10 -5 3.6*10 -5 1.1*10 -5<br />
Table 8. Mean cross sectional area, bankfull width, depth, maximum bankfull depth, <strong>and</strong> width to depth ratio measured <strong>for</strong> 2 pools in<br />
<strong>the</strong> existing stream channel <strong>and</strong> 8 pools in <strong>the</strong> stream channel shortly after construction in <strong>the</strong> fall <strong>of</strong> 2003 (as built) <strong>for</strong> <strong>the</strong> Young<br />
Creek State L<strong>and</strong>s Stream Restoration Project. Variance estimates <strong>for</strong> annual mean values are presented in paren<strong>the</strong>ses. Mean values<br />
between treatments were compared using a t-test, <strong>and</strong> <strong>the</strong> one tailed p-value <strong>for</strong> each comparison is presented. The percent change <strong>for</strong><br />
each parameter between treatments is also presented.<br />
Pool Cross<br />
Sections<br />
Cross<br />
Sectional Area<br />
(ft 2 )<br />
Mean Bankfull<br />
Width (ft)<br />
Mean Bankfull<br />
Depth (ft)<br />
Maximum Bankfull<br />
Depth (ft)<br />
Width to Depth<br />
Ratio<br />
Existing 19.25 (3.13) 23.5 (24.5) 0.79 (0.005) 2.35 (0.13) 30.14 (80.15)<br />
As Built (2003) 37.68 (65.09) 21.8 (18.0) 1.73 (0.084) 3.23 (0.42) 12.99 (12.78)<br />
Percent Change 95.7%<br />
t-test P Value 0.0076<br />
-7.18% 119.0% 0.318 37.77% -56.9%<br />
0.0012 0.053 0.0008<br />
142