26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

250<br />

Catch Per Net<br />

200<br />

150<br />

100<br />

50<br />

Fall Model<br />

Y = 0.0638x + 24.076<br />

r 2 = 0.0031; p = 0.76<br />

Spring Model<br />

Y = 1.8494x + 62.934<br />

r 2 = 0.1047; p = 0.09<br />

0<br />

1975<br />

1978<br />

1982<br />

1985<br />

1987<br />

1989<br />

1991<br />

1993<br />

1995<br />

1997<br />

1999<br />

2001<br />

2003<br />

Year<br />

Spring Fall Linear (Fall) Linear (Spring)<br />

Figure 40. Catch per net (all species combined) in fall floating <strong>and</strong> spring sinking gillnets<br />

<strong>and</strong> associated trend lines in <strong>Libby</strong> Reservoir, 1975 through 2003.<br />

101

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!