26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The classification scores are 0-3- Normal; 4-7 moderate deviant; 8-11 extreme deviant; 12<br />

non-functioning. In 2002, Grave Creek scored 6—moderately deviant from mountain<br />

reference conditions. In 2003, <strong>the</strong> site scored 5—also moderately deviant from mountain<br />

reference conditions. Both years had about 50% <strong>of</strong> <strong>the</strong> community composed <strong>of</strong> collectorga<strong>the</strong>rers<br />

whereas reference conditions anticipate about < 33%. Similarly, both years (2002-<br />

38%; 2003-29%)had a greater proportion <strong>of</strong> <strong>the</strong> community composed <strong>of</strong> Dipera than<br />

anticipated <strong>for</strong> mountain reference sites (

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!