26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2460<br />

2440<br />

2420<br />

2400<br />

2380<br />

2360<br />

2340<br />

2320<br />

2300<br />

1977<br />

1979<br />

1981<br />

1983<br />

1985<br />

1987<br />

1989<br />

1991<br />

1993<br />

1995<br />

1997<br />

1999<br />

2001<br />

2003<br />

Full Pool (2459 ft)<br />

Maximum reservoir elevation<br />

Minimum reservoir<br />

Water Year<br />

Figure 3. <strong>Libby</strong> Reservoir elevations (minimum, maximum), water years (October 1 – Sept. 30), 1976 through 2003.<br />

34<br />

Reservoir Elevation (ft)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!