Table 1. Design specifications <strong>for</strong> <strong>the</strong> upper <strong>Libby</strong> Creek (Clevel<strong>and</strong>’s) channel<br />

restoration project.<br />

Channel Design Range Mean Existing – 1999<br />

(Mean)<br />

Design Channel Type<br />

(C4) Drainage Area = 12 sq.<br />

miles<br />

Total Length 3,200 2,700 (braided<br />

throughout)<br />

Bankfull Width (ft) 28-35 33 28-43 (37)<br />

Bankfull Area (ft 2 ) 40-60 47 47-123<br />

Width/Depth Ratio 20-23 21.5 15-35<br />

Sinuosity 1.3 – 1.7 1.6 1.1 – 1.06 (1.1)<br />

B<strong>and</strong> Width (ft) 100 -140 135 135<br />

Radius <strong>of</strong> Curvature (Rc) (ft) 88-135 106 108-204 (143)<br />

Rc/Wbf Ratio* 2.75 – 4.2 3.3 3.3 – 6.3 (4.4)<br />

Mean Bankfull Depth (ft) 2.0-2.2 2.1 0.58 – 1.79 (1.18)<br />

Max Bankfull Depth (ft) 2.5-3.2 3.0 1.6-3.1 (2.15)<br />

Max Scour Depth (ft) 7.0 7.0<br />

Riffle Mean Velocity (fps) 5.0-6.0 5.5 6.5 – 7.0 (6.8)<br />

Me<strong>and</strong>er Length (ft) 290-485 369 184 – 900 (481)<br />

Pool Spacing (ft) 75 –100’ 80’ 127 –500 (247)<br />

Riffle Slope ft/ft (Base Flow) 0.018 – 0.020 0.019 0.011-0.033 (0.019)<br />

Pool Slope ft/ft (Base Flow) 0.002 – 0.003 0.0025 0.007-0.003 (0.005)<br />

* Rc/Wbf ratio <strong>for</strong> higher bedload C4 stream types should average 3.0 – 3.5 to effectively<br />

transport sediment.<br />