Mitigation for the Construction and Operation of Libby Dam
Mitigation for the Construction and Operation of Libby Dam
Mitigation for the Construction and Operation of Libby Dam
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 1. Design specifications <strong>for</strong> <strong>the</strong> upper <strong>Libby</strong> Creek (Clevel<strong>and</strong>’s) channel<br />
restoration project.<br />
Channel Design Range Mean Existing – 1999<br />
(Mean)<br />
Design Channel Type<br />
(C4) Drainage Area = 12 sq.<br />
miles<br />
Total Length 3,200 2,700 (braided<br />
throughout)<br />
Bankfull Width (ft) 28-35 33 28-43 (37)<br />
Bankfull Area (ft 2 ) 40-60 47 47-123<br />
Width/Depth Ratio 20-23 21.5 15-35<br />
Sinuosity 1.3 – 1.7 1.6 1.1 – 1.06 (1.1)<br />
B<strong>and</strong> Width (ft) 100 -140 135 135<br />
Radius <strong>of</strong> Curvature (Rc) (ft) 88-135 106 108-204 (143)<br />
Rc/Wbf Ratio* 2.75 – 4.2 3.3 3.3 – 6.3 (4.4)<br />
Mean Bankfull Depth (ft) 2.0-2.2 2.1 0.58 – 1.79 (1.18)<br />
Max Bankfull Depth (ft) 2.5-3.2 3.0 1.6-3.1 (2.15)<br />
Max Scour Depth (ft) 7.0 7.0<br />
Riffle Mean Velocity (fps) 5.0-6.0 5.5 6.5 – 7.0 (6.8)<br />
Me<strong>and</strong>er Length (ft) 290-485 369 184 – 900 (481)<br />
Pool Spacing (ft) 75 –100’ 80’ 127 –500 (247)<br />
Riffle Slope ft/ft (Base Flow) 0.018 – 0.020 0.019 0.011-0.033 (0.019)<br />
Pool Slope ft/ft (Base Flow) 0.002 – 0.003 0.0025 0.007-0.003 (0.005)<br />
* Rc/Wbf ratio <strong>for</strong> higher bedload C4 stream types should average 3.0 – 3.5 to effectively<br />
transport sediment.<br />
130