Mitigation for the Construction and Operation of Libby Dam
Mitigation for the Construction and Operation of Libby Dam
Mitigation for the Construction and Operation of Libby Dam
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Figure 18. Capture locations <strong>for</strong> a typical burbot tagged with an acoustic tag. This particular<br />
burbot was captured on January 14, 2004 (Point A) in a baited hoop trap fished near <strong>the</strong><br />
confluence <strong>of</strong> Big Creek (river mile 248.7). This fish was relocated on 1/21/04, 2/11/04,<br />
2/20/04, 2/25/04, <strong>and</strong> 3/3/04, Points B thru E, respectively.<br />
72