26.12.2014 Views

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

Mitigation for the Construction and Operation of Libby Dam

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 18. Capture locations <strong>for</strong> a typical burbot tagged with an acoustic tag. This particular<br />

burbot was captured on January 14, 2004 (Point A) in a baited hoop trap fished near <strong>the</strong><br />

confluence <strong>of</strong> Big Creek (river mile 248.7). This fish was relocated on 1/21/04, 2/11/04,<br />

2/20/04, 2/25/04, <strong>and</strong> 3/3/04, Points B thru E, respectively.<br />

72

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!