Municipal Forest — 50th Year Anniversary<br />

introduction and Overview<br />

110<br />

ENGINEERING & PUBLIC WORKS DEPARTMENT<br />

The engineering department includes public works and environmental services. Specific<br />

departmental duties include subdivision infrastructure, soil removal and deposit, transit and traffic,<br />

capital works projects and infrastructure planning.<br />

The public works' section is responsible for drainage and diking, water and sewer utilities,<br />

municipal equipment and road maintenance. Environmental services section is responsible for<br />

waste and environmental management, drafting and implementation the Environmental Charter.<br />

MAJOR INITIATIVES OR PROJECTS<br />

➢ Drafted Environmental Charter (adopted by council in April <strong>of</strong> 2008),<br />

which included initiatives such as:<br />

low flow toilet reimbursement program<br />

improved sprinkling restrictions<br />

rain barrel program<br />

➢ Implemented landfill (Minnie's Pit) diversion strategies including:<br />

Composting pilot project started<br />

Banning the disposal <strong>of</strong> recyclable materials<br />

Potential Salvage<br />

➢ Worked with BC Transit to expand the Cedar Valley transit route.<br />

Environmental<br />

Charter<br />

°Adding AbilitytoSta<br />

O,"<br />

<strong>Mission</strong>'s Plan for<br />

Environmental Sustainability<br />

➢ Applied non-slip surface to four hills / highway approaches in the downtown core<br />

area.<br />

➢ Installed audible pedestrian signals at 11 th Avenue and Stave Lake Street.<br />

➢ Reconfigure Intersection at 7th and Cedar.<br />

➢ Completed the River Crossing Study.<br />

➢ Oversaw the construction <strong>of</strong> 2.4 km <strong>of</strong> new<br />

roadway and 2.9 km <strong>of</strong> new sidewalks.<br />

➢ Reconstructed 1 km <strong>of</strong> roadway at three different<br />

locations amounting to $1 million in repairs.<br />

➢ Expanded the equipment shed to provide<br />

additional out-<strong>of</strong>-the-weather storage and<br />

security for Municipal equipment and tools.<br />

wy MAW<br />

MUT<br />

2008 Annual Report - <strong>District</strong> <strong>of</strong> <strong>Mission</strong>