67<br />

UMC Report No. 32 -<strong>2009</strong><br />

Page 5 <strong>of</strong> 5<br />

."§_11Qpr<br />

F ild Logistics<br />

A preliminary discussion has been initiated with the City <strong>of</strong> Abbotsford's auditor on the proposed<br />

strategy with respect to the new Public Sector Accounting Board 3<strong>15</strong>0 regulations (PSAB). No<br />

major concern has been raised by the City's auditor at this point, except some changes to the<br />

present administrative procedures.<br />

Peak Day Demands usually happen during summer time when the weather is hot and water<br />

consumption is high. The calculation <strong>of</strong> "over-usage" fee and the cashflow between the two<br />

municipalities regarding the Joint Water Capital Projects based on Peak Day Demands is<br />

expected to be completed before year end.<br />

FINANCIAL PLAN IMPLICATIONS<br />

Initial contributions to the Joint Water Capital Projects by Abbotsford and <strong>Mission</strong> will be based<br />

on the projected "growth" (Peak Day Demand Flow Split). Annual rebalancing <strong>of</strong> revenues will<br />

occur for each asset every year based on the actual "growth" by each municipality until the end<br />

<strong>of</strong> the additional system capacity the asset brings forth.<br />

COMMUNICATION PLAN<br />

Not applicable.<br />

SUMMARY<br />

The proposed cost sharing formula discussed in this report incorporates the concept <strong>of</strong> "growth"<br />

and "Peak Day Demands". The formula accommodates deviations from the projected "growth"<br />

by each municipality and provides a more accurate method <strong>of</strong> distributing costs. It is<br />

recommended that the proposed strategy be approved by the WSC for determining the cost<br />

sharing <strong>of</strong> Joint Water Capital projects from 2010 onwards.<br />

Upon acceptance <strong>of</strong> this strategy, Staff will expand the spreadsheet framework to all Joint Water<br />

Capital Projects; and will start developing a cost sharing formula for the Joint Sewer Capital<br />

Projects y gi1ilar concepts discussed in this report.<br />

Jim Gdon, P.Eng.<br />

General Manager, Engineering and<br />

Regional Utilities<br />

Stella Chiu;\P„.E, M.Eng., LEED AP<br />

Wastewater Pining/Process Engineer<br />

Rob I ac,<br />

Wastewater and Asset Engineering Manager