01.01.2015 Views

June 15, 2009 - District of Mission

June 15, 2009 - District of Mission

June 15, 2009 - District of Mission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

287<br />

BROWNFIELD RENEWAL FUNDING PROGRAM GUIDE Intake # 09-01<br />

APPENDIX 1.0<br />

Eligible Activities for Funding<br />

Eligible Activities and Maximum Provincial Contributions<br />

Under the Brownfield Renewal Funding Program<br />

Type <strong>of</strong><br />

Activity<br />

Maximum<br />

Provincial<br />

Contribution<br />

(%)A<br />

Maximum<br />

Provincial<br />

Contribution<br />

($)A<br />

a. Preliminary Site Investigations 85% $40,000<br />

b. Detailed Site Investigations<br />

c. Analysis and interpretation, including tests, sampling, surveys,<br />

data evaluation, risk assessment (human and ecological);<br />

d. Evaluation <strong>of</strong> alternative methods <strong>of</strong> remediation;<br />

e. Preparation <strong>of</strong> a remediation plan, including a plan for any<br />

consequential or associated removal <strong>of</strong> soil or soil relocation<br />

from the site;<br />

f. Investigation and classification <strong>of</strong> on-site wastes not<br />

associated with environmental media (soil, sediments, surface<br />

water, groundwater, air/vapour, animals and plants), to<br />

determine their status under the Hazardous Waste Regulation<br />

and the Environmental Management Act for the purposes <strong>of</strong><br />

deciding on appropriate management (e.g., asbestos, lead<br />

based paint, PCB-containing lamp ballasts, etc.)<br />

g. Removal <strong>of</strong> above ground and underground petroleum or<br />

chemical storage tanks; and<br />

h. Quality assurance activities such as verification sampling,<br />

analysis and monitoring related to items (f) and (g) above.<br />

*As defined in Chapter 53, section 41 <strong>of</strong> the BC Environmental<br />

Management Act<br />

Ts u)<br />

"' a S a) 1,=<br />

E 03<br />

c 0)<br />

fri<br />

'52 co<br />

c<br />

w —<br />

c<br />

— 03<br />

c<br />

(r.)<br />

=<br />

2<br />

'5 (I)<br />

c a)<br />

w •:-.=•<br />

.—<br />

-0 a) 7.5<br />

as <<br />

T)<br />

EL<br />

ci.)—<br />

_c<br />

5<br />

70% $125,000<br />

50% $125,000<br />

50% $125,000<br />

"Maximum funding provided for each application is based on the lesser <strong>of</strong> either the maximum dollar<br />

amount or the maximum percentage <strong>of</strong> the activity for which funding is requested.<br />

Up to 10% <strong>of</strong> the funding received can be applied to any pr<strong>of</strong>essional service costs that were incurred for<br />

the preparation <strong>of</strong> the application to the Program.<br />

8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!