Water Capital<br />
<strong>2013</strong> 2010 2010 <strong>Budget</strong> <strong>Budget</strong> Highlights:<br />
<br />
$1,700,000 replacement <strong>of</strong> the Warren Avenue<br />
Bridge Watermain and associated seismic<br />
upgrade to pipe supports and restraints<br />
and installation <strong>of</strong> seismic isolation valves<br />
for watermains on both bridges.<br />
Replacement <strong>of</strong> the water mains on Pacific<br />
Avenue between 6 th and 11 th during the<br />
Street project<br />
Construction <strong>of</strong> improvements in preparation<br />
for the move <strong>of</strong> the Engineering Division to<br />
the Oyster Bay Facility in 2014<br />
On-going minor capital upgrades to the distribution<br />
system, pump stations, reservoirs<br />
and treatment facilities<br />
2010 <strong>2013</strong> Capital Considerations:<br />
<br />
All major capital work proposed is rate<br />
funded.<br />
2012 2009 2009 Accomplishments:<br />
<br />
Completed Audit and OIG Investigations <strong>of</strong><br />
the ARRA funded UV facility<br />
Separated power service <strong>of</strong> the Oyster Bay<br />
warehouse from the Administration Building<br />
and activated antenna to allow Water Resources<br />
relocation to the Oyster Bay facility.<br />
Replaced cast iron watermain under 4 th<br />
Street with street/cinema project.<br />
Design <strong>of</strong> the Warren Avenue Bridge watermain<br />
project.<br />
Coordination with the Jarstad Family for<br />
improvements to Jarstad Park<br />
<strong>2013</strong> Goals:<br />
Complete all projects identified in the budget<br />
highlights<br />
131