2013 Annual Budget - City of Bremerton
2013 Annual Budget - City of Bremerton
2013 Annual Budget - City of Bremerton
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
General Facilities<br />
<strong>2013</strong> <strong>Budget</strong> Highlights:<br />
2012 Capital Considerations:<br />
This function provides facility maintenance support<br />
(landscape maintenance and building systems<br />
maintenance; custodial and cleaning some inhouse,<br />
some contracted) for all general-fund<br />
owned facilities except Parks, including the Conference<br />
Center, Norm Dicks Government Center,<br />
Police and Fire, Court, Naval Museum, Equipment<br />
services, Public Works Complex, Parking facilities,<br />
Library, and the Ferry Terminal Tunnel Control<br />
Room.<br />
<strong>2013</strong> is a “no frills” budget year for facilities<br />
maintenance:<br />
o Focus is to maintain similar level<br />
<strong>of</strong> service to General Fund buildings<br />
in <strong>2013</strong>, with minor reduction<br />
in funding<br />
o Includes maintenance <strong>of</strong> new<br />
parking garage<br />
<br />
Police Ro<strong>of</strong> repair to the Annex building<br />
2012 Accomplishments:<br />
<strong>2013</strong> Goals:<br />
<br />
Zero lost-time accidents<br />
<br />
Zero lost-time accidents<br />
<br />
<br />
Maintained landscaping at all <strong>City</strong> buildings<br />
after maintenance contract was eliminated<br />
to reduce costs.<br />
Performed all needed repairs and corrections<br />
at General Fund buildings and<br />
grounds while staying within the budget<br />
limits.<br />
<br />
<br />
Expand use <strong>of</strong> the Cartegraph maintenance<br />
s<strong>of</strong>tware application in Facility operations<br />
for both General Fund and Utility building<br />
maintenance.<br />
Identify and develop a plan to eliminate<br />
existing structures which are no longer in<br />
use (example: old Cencom building).<br />
<br />
Tested all facility fire alarm and suppression<br />
equipment as required under National<br />
Fire Protection Association (NFPA) codes.<br />
<br />
Prepared installation site and contracted<br />
for a new emergency generator at Fire Station<br />
#1.<br />
68