WORKSHEET #34: VERIFICATION (STEP 1) PROCESS TABLE<br />
This worksheet describes the processes that will be followed to verify project data quality.<br />
The table below describes how each item will be verified, when the activity will occur,<br />
what documentation is necessary, and who the responsible person is.<br />
Verification<br />
Input<br />
Chain-of-<br />
Custody<br />
Audit<br />
Reports<br />
<strong>Field</strong> Notes<br />
Analytical<br />
Data<br />
Packages<br />
Table 34-1. Verification Process<br />
Description<br />
Chain-of-custody <strong>for</strong>ms will be reviewed by the project team in the<br />
field upon completion and verified against the packed sample<br />
coolers they represent. The shipper’s signature on the chain-ofcustody<br />
will be initialed by the reviewer, a copy of the chain-ofcustody<br />
retained in the project file, and the original and remaining<br />
copies taped inside the cooler <strong>for</strong> shipment.<br />
A copy of all audit reports will be placed in the project file upon<br />
completion. If corrective actions are required, a copy of the<br />
documented corrective action taken will be attached to the<br />
appropriate audit report in the project file. At the beginning of each<br />
week and at the completion of the site work, project file audit reports<br />
will be reviewed internally to ensure that all appropriate corrective<br />
actions have been taken and that corrective action reports have<br />
been attached. If corrective actions have not been taken, the project<br />
manager will be notified to ensure action is taken.<br />
<strong>Field</strong> notes will be reviewed internally and placed in the project file.<br />
A copy of the field notes will be attached to the final report.<br />
All laboratory data packages will be verified internally by the<br />
laboratory per<strong>for</strong>ming the work <strong>for</strong> completeness and technical<br />
accuracy prior to submittal.<br />
All data packages will be verified externally by data validator who is<br />
not associated with the collection and analysis of samples,<br />
interpretation of sample data, or with any decision-making process<br />
within the scope of this investigation. The EWI #1 3EN2.1-specified<br />
data validation strategy <strong>for</strong> this project is 20% Level IV data<br />
validation and 80% Level III data validation <strong>for</strong> all laboratory data. In<br />
Level III data validation, data quality is assessed evaluating<br />
parameters by the appropriate criteria (or limits) specified in<br />
Worksheets 12, 19, and 28 of the project SAP, Contract Laboratory<br />
Program (CLP) requirements, EWI 3EN2.1 requirements, or the<br />
analytical methods. If calculations <strong>for</strong> quantitation are verified, it is<br />
done on a limited basis and may require raw data in addition to the<br />
standard data <strong>for</strong>ms normally present in a data package.<br />
Level IV data validation follows the EPA protocols and CLP criteria<br />
set <strong>for</strong>th in the functional guidelines <strong>for</strong> evaluating organic and<br />
inorganic analyses (EPA 1999, 2004). Level IV data validation<br />
consists of Level III data validation as well as checking calculations<br />
of quantified analytical data, including routine field samples and field<br />
and laboratory QC samples. Additionally, instrument per<strong>for</strong>mance,<br />
calibration, and calibration standard data are evaluated to ensure<br />
that detection limits and data values are appropriate.<br />
Internal/External<br />
Internal<br />
Internal<br />
Internal<br />
Internal and<br />
External<br />
Responsible<br />
<strong>for</strong><br />
Verification<br />
(name,<br />
organization)<br />
<strong>Field</strong><br />
Personnel<br />
Ann<br />
Bernhardt,<br />
AMEC<br />
Program<br />
QCM<br />
<strong>Field</strong><br />
Personnel<br />
Internal:<br />
Tina Green/<br />
BC Labs<br />
External:<br />
Jeanne<br />
Peterson/<br />
AQA<br />
Final Sampling and Analysis Plan<br />
Installation Restoration Site 29, Hangar 1<br />
Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>, Cali<strong>for</strong>nia<br />
DCN: AMEC-8816-0005-0039<br />
April 2010<br />
Page 34-1