limits established by the analytical<br />

method or some other document.<br />

Also, discuss why the Project<br />

Quantitation Limit Goal <strong>for</strong> arsenic<br />

is less than the QL. Revise the SAP<br />

to include all relevant laboratoryspecific<br />

SOPs as discussed the<br />

Uni<strong>for</strong>m Federal Policy <strong>for</strong> Quality<br />

Assurance Project Plans Manual<br />

dated March 2005 (UFP QAPP<br />

Manual) or provide a summary of<br />

all laboratory procedures in the<br />

SAP. Also, revise the SAP to<br />

reference a source <strong>for</strong> the QLs and<br />

MDLs presented in Worksheet #15.<br />

Finally, assess the QL <strong>for</strong> arsenic to<br />

ensure that it meets the PAL.<br />

5 <strong>Field</strong> Duplicates. This SAP states<br />

that field duplicate samples will not<br />

be collected due to the nonhomogenous<br />

nature of soils and<br />

sediments; however, it is unclear<br />

how reliable decisions can be made<br />

if sample heterogeneity is a<br />

concern. Collection of duplicates is<br />

recommended and procedures<br />

should be included to assess sample<br />

heterogeneity. Revise the SAP to<br />

include field duplicates <strong>for</strong> soil and<br />

sediment samples. Additionally,<br />

indicate what measures will be<br />

taken to reduce sample<br />

heterogeneity.<br />

listed are specific to BC Labs as<br />

identified in Worksheet 30.<br />

The Project Quantitation Limit<br />

Goal <strong>for</strong> arsenic will be changed to<br />

0.5 mg/kg.<br />

<strong>Field</strong> duplicate samples <strong>for</strong> soil<br />

and sediment will be collected at<br />

10% frequency.<br />

The sampling procedure will be<br />

revised to include homogenization<br />

process.<br />

Response to Comments on Draft Sampling and Analysis Plan<br />

<strong>Moffett</strong> <strong>Field</strong>, Cali<strong>for</strong>nia<br />

DCN: AMEC-8816-0005-0040<br />

April 2010<br />

Page 6 of 10