24.04.2015 Views

FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field

FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field

FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WORKSHEET #23: ANALYTICAL SOP REFERENCES TABLE<br />

This worksheet identifies all analytical procedures that will be implemented during this<br />

project. This worksheet will be completed upon laboratory procurement. Laboratoryspecific<br />

SOPs will be listed <strong>for</strong> all off-site analyses and copies of the SOPs will be<br />

included in Appendix C of this SAP upon laboratory procurement. The laboratory SOP<br />

reference numbers will be referenced throughout the SAP to refer to a specific SOP.<br />

Lab SOP<br />

Number<br />

BCORG019<br />

Title, Revision<br />

Date, and/or<br />

Number<br />

Gas<br />

Chromatorgraphy<br />

<strong>for</strong> PCBs EPA<br />

8082 Rev.8<br />

BCMET013 Determination of<br />

Metals and Trace<br />

Elements in<br />

Water and Waste<br />

Water by ICP-<br />

AES 200.7/6010<br />

Rev.15<br />

1265 CARB 435 and<br />

EPA Screening<br />

Protocol Modified<br />

(Qualitative and<br />

Semi-<br />

Quantitative)<br />

using PLM, Rev.<br />

0<br />

BCORG019 Gas<br />

Chromatorgraphy<br />

<strong>for</strong> PCBs EPA<br />

8082 Rev.8<br />

Table 23-1. Analytical SOP Reference Table<br />

Definitive<br />

or<br />

Screening<br />

Data<br />

Definitive<br />

Definitive<br />

Definitive<br />

Matrix and<br />

Analytical<br />

Group<br />

Soil/Sediment,<br />

PCBs<br />

Soil/Sediment,<br />

Lead<br />

Soil/Sediment,<br />

Asbestos<br />

Instrument<br />

Organization<br />

Per<strong>for</strong>ming<br />

Analysis<br />

Modified<br />

<strong>for</strong> Project<br />

Work?<br />

(Y/N)<br />

GC BC Labs N<br />

ICP BC Labs N<br />

Microscope EM Lab N<br />

Definitive Wipe, PCBs GC BC Labs N<br />

Final Sampling and Analysis Plan<br />

Installation Restoration Site 29, Hangar 1<br />

Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>,<br />

Cali<strong>for</strong>nia<br />

DCN: AMEC-8816-0005-0039<br />

April 2010<br />

Page 23-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!