FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field
FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field
FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
WORKSHEET #20: FIELD QUALITY CONTROL SAMPLE SUMMARY<br />
<strong>Field</strong> QC samples serve as a check on the precision and accuracy of analytical methods and instrumentation, and potential<br />
contamination that may occur during laboratory sample preparation and analyses.<br />
Matrix<br />
Analytical<br />
Group<br />
No. of<br />
Sampling<br />
Events<br />
Table 20-1. <strong>Field</strong> Quality Control Sample Summary<br />
No. of <strong>Field</strong><br />
Duplicates<br />
No. of<br />
MS/MSDs<br />
No. of<br />
<strong>Field</strong><br />
Blanks<br />
No. of Equip.<br />
Blanks<br />
No. of VOA<br />
Trip Blanks<br />
No. of PT<br />
Samples<br />
Anticipated<br />
No. of<br />
Samples to<br />
Lab<br />
Soil PCBs 155 1 16 8 0 0 0 0 179<br />
Soil Lead 104 1 11 6 0 0 0 0 121<br />
Soil Asbestos 104 1 11 0 0 0 0 0 121<br />
Soil SVOCs 2 0 1 0 0 0 0 3<br />
Soil PAHs 2 0 1 0 0 0 0 3<br />
Soil TPHs 2 0 1 0 0 0 0 3<br />
Sediment PCBs 8 1 1 0 0 0 0 10<br />
Sediment Lead 8 1 1 0 0 0 0 10<br />
Sediment Asbestos 8 1 0 0 0 0 0 10<br />
Wipe PCBs 41 2 0 0 2 0 0 0 43<br />
Wipe Lead 41 2 0 0 2 0 0 0 43<br />
Notes:<br />
1<br />
Total number of soil sample will increase if excavation is necessary.<br />
2<br />
Additional wipe samples will be collected if decontamination of the Hangar floor is warranted.<br />
Final Sampling and Analysis Plan<br />
Installation Restoration Site 29, Hangar 1<br />
Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>, Cali<strong>for</strong>nia<br />
DCN: AMEC-8816-0005-0039<br />
April 2010<br />
Page 20-1