Instrument<br />
WORKSHEET #24: ANALYTICAL INSTRUMENT CALIBRATION TABLE<br />
This worksheet provides a list of analytical instrumentation required to per<strong>for</strong>m the laboratory analyses and the associated<br />
calibration procedures. In addition, documentation of the frequency, acceptance criteria, and corrective action requirements are<br />
also provided. All instruments will be calibrated according to the schedule specified by the method and instrument manual or<br />
applicable SOPs. This worksheet will be completed upon laboratory procurement.<br />
Calibration<br />
Procedure<br />
GC ICAL Initially, prior to sample<br />
analysis<br />
GC Second source<br />
initial calibration<br />
verification (ICV)<br />
GC CCV Daily be<strong>for</strong>e sample<br />
analysis, every 10<br />
samples, and at the end of<br />
the analysis sequence<br />
GC/MS<br />
ICAL<br />
Table 24-1. Analytical Instrument Calibration<br />
Frequency of Calibration Acceptance Criteria Corrective Action<br />
One of the options below:<br />
Option 1: relative standard<br />
deviation (RSD) <strong>for</strong> each<br />
analyte ≤ 20%<br />
Option 2: linear least<br />
squares regression:<br />
r≥0.995<br />
Option 3: non-linear<br />
regression: coefficient of<br />
determination (COD) r 2 ≥<br />
0.99.<br />
After every ICAL All analytes within ± 20%<br />
of expected value from the<br />
ICAL.<br />
Method inception, CCAL<br />
fails<br />
All analytes within ± 20%<br />
of expected value from the<br />
ICAL.<br />
Locate the source of the problem. If<br />
expected RSD is not met, then check<br />
<strong>for</strong> standard degradation or per<strong>for</strong>m<br />
instrument adjustment and/or<br />
maintenance to correct the problem and<br />
repeat ICAL.<br />
Prepare fresh standard and re-analyze<br />
ICV to rule out standard degradation or<br />
inaccurate injection. If problem persists,<br />
then per<strong>for</strong>m instrument adjustment<br />
and/or maintenance to correct the<br />
problem and repeat ICAL.<br />
Prepare fresh standard and re-analyze<br />
CCV to rule out standard degradation<br />
or inaccurate injection. If problem<br />
persists, then per<strong>for</strong>m instrument<br />
adjustment and/or maintenance to<br />
correct the problem and repeat ICAL.<br />
Person<br />
Responsible <strong>for</strong><br />
Corrective Action<br />
Laboratory Analyst<br />
Laboratory Analyst<br />
Laboratory Analyst<br />
SOP<br />
Reference<br />
BCORG019<br />
BCORG005<br />
BCORG019<br />
BCORG005<br />
BCORG019<br />
BCORG005<br />
RRF ≥ 0.05, %RSD