firm. These draft records will be compared to the planned test and sample receipt records to insure<br />

completeness of the data deliverables. Data will be reported with 80 percent (%) Level III and 20%<br />

Level IV data package. AMEC will supply the data validator with a data validation EDD to<br />

populate with data qualifiers and reason codes. Following validation, AMEC will load this<br />

validation EDD into the project database, update the records with any applied qualifiers and reason<br />

codes, and flag all validated results as validated.<br />

Once the data validation records are updated in the database, AMEC will per<strong>for</strong>m a 20% check of<br />

analytical records from the database to hard copy analytical reports, and a 100% check of handentered<br />

field data, by comparing the field data sheets to field data in the database. If any systemic<br />

errors are identified in the analytical records, then a full 100% check will be per<strong>for</strong>med on the<br />

relevant data deliverables.<br />

Finally, the Data Manager will export validated and quality checked data from the database as<br />

EDDs con<strong>for</strong>ming to the Naval Electronic Data Deliverable (NEDD) <strong>for</strong>mat, checked with the<br />

NIRIS data checker, and loaded into the NIRIS database.<br />

14.7 Data Tracking, Storage, Archiving, Retrieval, and Security<br />

14.7.1 Electronic Data:<br />

The data tracking process is described above. The electronic data will be stored on a<br />

structure query language (SQL)-Server database using the Earthsoft EQuIS 5 data<br />

management system. Daily backups will be per<strong>for</strong>med by the SQL-Server system and<br />

archived on a separate file server. In addition, AMEC’s in<strong>for</strong>mation technology staff will<br />

per<strong>for</strong>m daily backups of both servers to a tape drive.<br />

Only a limited subset of AMEC database users is allowed access to the physical server. In<br />

addition, this project’s database will further limit access only to users who work directly on<br />

the project. Individual user rights will vary depending on their project role.<br />

14.7.2 Documentation and Records:<br />

<strong>Field</strong> logs, field <strong>for</strong>ms, chains-of-custody, correspondence, and project reports will be<br />

maintained in electronic <strong>for</strong>mat at the AMEC San Diego office at completion of the<br />

project. Hard copies of field <strong>for</strong>ms and chains-of-custody will be retained on-site in the<br />

project files until demobilization of the project.<br />

14.7.3 Assessment/Audit Tasks:<br />

Audits of field staff compliance with project SOPs will be per<strong>for</strong>med on a periodic basis as<br />

determined by the Project QCM, consistent with AMEC SOP FP-F-5. At least one audit<br />

will be per<strong>for</strong>med during each sampling task, as defined in this Worksheet. Audits of<br />

Final Sampling and Analysis Plan<br />

Installation Restoration Site 29, Hangar 1<br />

Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>,<br />

Cali<strong>for</strong>nia<br />

DCN: AMEC-8816-0005-0039<br />

April 2010<br />

Page 14-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!