Process<br />
Step 3<br />
Identify<br />
in<strong>for</strong>mation<br />
inputs<br />
Step 4<br />
Define the study<br />
boundaries<br />
Table 11-1. Data Quality Objectives Summary<br />
Pre-Construction and Confirmation Sampling<br />
Response<br />
construction samples to verify that contaminants were not released to the<br />
environment?<br />
5. Are the results of PCBs, metals, semi-volatile organic compounds (SVOCs),<br />
polyaromatic hydrocarbons (PAHs), total petroleum hydrocarbons (TPHs),<br />
asbestos and pH in imported soil (clean fill) samples within the regulatory limits<br />
listed in Worksheet 15?<br />
Baseline/pre-construction concentrations of PCBs, lead, and asbestos will be established<br />
from pre-construction samples collected from the soil areas adjacent to Hangar 1 and the<br />
sediment in the stormwater trench/conveyance system surrounding the building.<br />
Samples will be collected from the soil after the removal action and analyzed <strong>for</strong> PCBs,<br />
lead, and asbestos. If sediment is present in the stormwater trench/conveyance system,<br />
post-removal samples will be collected and analyzed <strong>for</strong> PCBs, lead, and asbestos.<br />
Concrete wipe samples will be collected from the floor of Hangar 1 and analyzed <strong>for</strong><br />
PCBs and lead. Soil to be imported to use as backfill, if excavation is necessary, will be<br />
sampled and analyzed <strong>for</strong> TPHs, PAHs, SVOCs, PCBs, asbestos, metals and pH.<br />
The proposed soil sample locations are presented in Figure 11-1 and the interior<br />
concrete floor samples are presented in Figure 11-2. Soil samples will be collected from<br />
the soil areas immediately adjacent to Hangar 1. Concrete wipe samples will be collected<br />
from the floor of Hangar 1, within its interior boundaries.<br />
Sediment samples will be collected from the sediment inside the stormwater<br />
trench/conveyance system. Sample locations will be determined based on where there is<br />
a sufficient amount of sediment present <strong>for</strong> sample collection.<br />
<strong>Field</strong> activities are anticipated to begin in June 2010 and end in August 2011. Preconstruction<br />
samples will be collected be<strong>for</strong>e removal activities begin. Confirmation<br />
samples will be collected after removal and decontamination activities have been<br />
completed.<br />
1. If the concentrations of PCBs in baseline/pre-construction soil sample exceeds<br />
the regulatory limit listed in Worksheet 15, then the surrounding contaminated<br />
soil will be removed half way to the next clean sample location, and confirmation<br />
samples will be collected from the bottom center and on all four sides of the<br />
excavation until the result of the confirmation sample indicates that the<br />
concentration of total PCB in soil is below 1000 µg/kg. The Navy will consult<br />
with the EPA and Water Board <strong>for</strong> concurrence on areas requiring soil removal..<br />
Step 5<br />
Develop the<br />
analytic approach<br />
If the concentration of PCBs in baseline/pre-construction or confirmation<br />
samples are below the regulatory limit listed in Worksheet 15, then soil removal<br />
will not be required.<br />
2. If the concentrations of lead and asbestos in post-construction confirmation soil<br />
samples are at or below the levels reported in baseline/pre-construction sample,<br />
then contaminants were not released to the environment from the removal<br />
action of Hangar 1 and no soil removal is required.<br />
If concentrations of lead and asbestos in post-construction confirmation samples<br />
are greater than baseline samples, results will be provided to EPA and Water<br />
Board <strong>for</strong> consultation to determine the appropriate response action.<br />
Final Sampling and Analysis Plan<br />
Installation Restoration Site 29, Hangar 1<br />
Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>,<br />
Cali<strong>for</strong>nia<br />
DCN: AMEC-8816-0005-0039<br />
April 2010<br />
Page 11-2