Process<br />

Step 3<br />

Identify<br />

in<strong>for</strong>mation<br />

inputs<br />

Step 4<br />

Define the study<br />

boundaries<br />

Table 11-1. Data Quality Objectives Summary<br />

Pre-Construction and Confirmation Sampling<br />

Response<br />

construction samples to verify that contaminants were not released to the<br />

environment?<br />

5. Are the results of PCBs, metals, semi-volatile organic compounds (SVOCs),<br />

polyaromatic hydrocarbons (PAHs), total petroleum hydrocarbons (TPHs),<br />

asbestos and pH in imported soil (clean fill) samples within the regulatory limits<br />

listed in Worksheet 15?<br />

Baseline/pre-construction concentrations of PCBs, lead, and asbestos will be established<br />

from pre-construction samples collected from the soil areas adjacent to Hangar 1 and the<br />

sediment in the stormwater trench/conveyance system surrounding the building.<br />

Samples will be collected from the soil after the removal action and analyzed <strong>for</strong> PCBs,<br />

lead, and asbestos. If sediment is present in the stormwater trench/conveyance system,<br />

post-removal samples will be collected and analyzed <strong>for</strong> PCBs, lead, and asbestos.<br />

Concrete wipe samples will be collected from the floor of Hangar 1 and analyzed <strong>for</strong><br />

PCBs and lead. Soil to be imported to use as backfill, if excavation is necessary, will be<br />

sampled and analyzed <strong>for</strong> TPHs, PAHs, SVOCs, PCBs, asbestos, metals and pH.<br />

The proposed soil sample locations are presented in Figure 11-1 and the interior<br />

concrete floor samples are presented in Figure 11-2. Soil samples will be collected from<br />

the soil areas immediately adjacent to Hangar 1. Concrete wipe samples will be collected<br />

from the floor of Hangar 1, within its interior boundaries.<br />

Sediment samples will be collected from the sediment inside the stormwater<br />

trench/conveyance system. Sample locations will be determined based on where there is<br />

a sufficient amount of sediment present <strong>for</strong> sample collection.<br />

<strong>Field</strong> activities are anticipated to begin in June 2010 and end in August 2011. Preconstruction<br />

samples will be collected be<strong>for</strong>e removal activities begin. Confirmation<br />

samples will be collected after removal and decontamination activities have been<br />

completed.<br />

1. If the concentrations of PCBs in baseline/pre-construction soil sample exceeds<br />

the regulatory limit listed in Worksheet 15, then the surrounding contaminated<br />

soil will be removed half way to the next clean sample location, and confirmation<br />

samples will be collected from the bottom center and on all four sides of the<br />

excavation until the result of the confirmation sample indicates that the<br />

concentration of total PCB in soil is below 1000 µg/kg. The Navy will consult<br />

with the EPA and Water Board <strong>for</strong> concurrence on areas requiring soil removal..<br />

Step 5<br />

Develop the<br />

analytic approach<br />

If the concentration of PCBs in baseline/pre-construction or confirmation<br />

samples are below the regulatory limit listed in Worksheet 15, then soil removal<br />

will not be required.<br />

2. If the concentrations of lead and asbestos in post-construction confirmation soil<br />

samples are at or below the levels reported in baseline/pre-construction sample,<br />

then contaminants were not released to the environment from the removal<br />

action of Hangar 1 and no soil removal is required.<br />

If concentrations of lead and asbestos in post-construction confirmation samples<br />

are greater than baseline samples, results will be provided to EPA and Water<br />

Board <strong>for</strong> consultation to determine the appropriate response action.<br />

Final Sampling and Analysis Plan<br />

Installation Restoration Site 29, Hangar 1<br />

Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>,<br />

Cali<strong>for</strong>nia<br />

DCN: AMEC-8816-0005-0039<br />

April 2010<br />

Page 11-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!