FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field
FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field
FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Process<br />
Table 11-1. Data Quality Objectives Summary<br />
Pre-Construction and Confirmation Sampling<br />
Response<br />
3. If the PCBs and lead concentrations in the post-construction confirmation<br />
concrete wipe samples exceed the regulatory limits listed in Worksheet 15, then<br />
the concrete floor will be decontaminated and re-sampled.<br />
If the PCB and lead concentrations in the post-construction confirmation<br />
concrete wipe samples are within the regulatory limits listed in Worksheet 15,<br />
then no further action is required.<br />
4. If the concentrations of PCBs, lead and asbestos in post-construction<br />
confirmation sediment samples (if sediment is present after pressure washing)<br />
are above the concentrations found in baseline/pre-construction samples,<br />
sediment will be removed and the stormwater trench will be rewashed.<br />
If the concentrations of PCBs, lead and asbestos in post-construction<br />
confirmation sediment samples (if sediment is present after pressure washing)<br />
are within the concentrations found in baseline/pre-construction samples, no<br />
further action is required.<br />
5. If the results of PCBs, TPHs, SVOCs, PAHs, asbestos, metals and pH in import<br />
soil samples are within the regulatory limits listed in Worksheet 15, then the soil<br />
is considered clean and will be imported to the site.<br />
If the results of PCBs, TPHs, SVOCs, PAHs, asbestos, metals or pH in import<br />
soil samples are above the regulatory limits listed in WS 15, then another import<br />
soil source will be identified and soil samples will be collected and analyzed.<br />
Regulatory limits <strong>for</strong> PCB, lead, and asbestos concentrations are presented in<br />
Worksheet 15.<br />
Step 6<br />
Specify<br />
per<strong>for</strong>mance or<br />
acceptance<br />
criteria<br />
Step 7<br />
Develop the plan<br />
<strong>for</strong> obtaining the<br />
data<br />
Laboratory data will be developed using EPA protocols, and the reported data will be<br />
evaluated using AMEC QA and quality control (QC) procedures.<br />
To minimize error samplers will be trained and samples will be collected in accordance<br />
with procedures described in this SAP.<br />
The laboratories will be evaluated by the Naval Facilities Engineering Services Center<br />
(NFESC) or will hold the Department of Defense (DoD) Environmental Laboratory<br />
Accreditation Program (ELAP) certification, and the Cali<strong>for</strong>nia Department of Public<br />
Health ELAP certification (<strong>for</strong> methods certified by Cali<strong>for</strong>nia). Laboratory standard<br />
operating procedures (SOPs) will comply with DoD Quality System Manual (QSM)<br />
version 4.1.<br />
The sampling design is presented in Worksheet 17.<br />
Final Sampling and Analysis Plan<br />
Installation Restoration Site 29, Hangar 1<br />
Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>,<br />
Cali<strong>for</strong>nia<br />
DCN: AMEC-8816-0005-0039<br />
April 2010<br />
Page 11-3