24.04.2015 Views

FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field

FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field

FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Instrument<br />

Calibration<br />

Procedure<br />

GC/MS<br />

GC/MS DFTPP<br />

Tune<br />

Prior to start of analysis<br />

GC/MS CCAL<br />

and every 12 hours<br />

thereafter<br />

ICP ICAL Daily and prior to sample<br />

analysis<br />

ICP ICV After ICAL, prior to<br />

beginning a sample run<br />

ICP CCV Daily be<strong>for</strong>e sample<br />

analysis, every 10<br />

samples, and at the end of<br />

the analysis sequence<br />

Polarized Light<br />

Microscopy<br />

(PLM)<br />

Blank<br />

Table 24-1. Analytical Instrument Calibration<br />

Frequency of Calibration Acceptance Criteria Corrective Action<br />

Person<br />

Responsible <strong>for</strong><br />

Corrective Action<br />

SOP<br />

Reference<br />

Beginning of 12-hour shift Method-specified Repeat until criteria are met Laboratory Analyst BCORG020<br />

Friable – one blank side<br />

daily or every 50 samples,<br />

whichever is less.<br />

Non-friable – one<br />

asbestos containing<br />

material (ACM) or nonfriable<br />

material every 20<br />

samples.<br />

RRF ≥ 0.05, %D±25%<br />

All analytes within ±10%<br />

of expected value. r ≥<br />

0.995.<br />

All analytes within + 10%<br />

of expected value<br />

RSD of replicate<br />

integrations: < 5%<br />

All analytes within + 10%<br />

of expected value<br />

RSD of replicate<br />

integrations < 5%<br />

Repeat CCAL once; repeat ICAL if<br />

second CCAL fails<br />

Prepare fresh standard and re-analyze<br />

ICV to rule out standard degradation or<br />

inaccurate injection. If problem persists,<br />

then per<strong>for</strong>m instrument adjustment<br />

and/or maintenance to correct the<br />

problem and repeat ICAL.<br />

If RSDs 5%, then per<strong>for</strong>m<br />

instrument maintenance to correct the<br />

problem and repeat ICAL.<br />

If RSDs 5%, then per<strong>for</strong>m<br />

instrument maintenance to correct the<br />

problem. Recalibrate and reanalyze all<br />

samples since last successful CCV.<br />

Laboratory Analyst<br />

Laboratory Analyst<br />

Laboratory Analyst<br />

Laboratory Analyst<br />

Negative Prepare and analyze another blank. Laboratory Analyst 1265<br />

BCORG020<br />

BCMET013<br />

BCMET013<br />

BCMET013<br />

Final Sampling and Analysis Plan<br />

Installation Restoration Site 29, Hangar 1<br />

Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>, Cali<strong>for</strong>nia<br />

DCN: AMEC-8816-0005-0039<br />

April 2010<br />

Page 24-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!