FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field
FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field
FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Instrument<br />
Calibration<br />
Procedure<br />
GC/MS<br />
GC/MS DFTPP<br />
Tune<br />
Prior to start of analysis<br />
GC/MS CCAL<br />
and every 12 hours<br />
thereafter<br />
ICP ICAL Daily and prior to sample<br />
analysis<br />
ICP ICV After ICAL, prior to<br />
beginning a sample run<br />
ICP CCV Daily be<strong>for</strong>e sample<br />
analysis, every 10<br />
samples, and at the end of<br />
the analysis sequence<br />
Polarized Light<br />
Microscopy<br />
(PLM)<br />
Blank<br />
Table 24-1. Analytical Instrument Calibration<br />
Frequency of Calibration Acceptance Criteria Corrective Action<br />
Person<br />
Responsible <strong>for</strong><br />
Corrective Action<br />
SOP<br />
Reference<br />
Beginning of 12-hour shift Method-specified Repeat until criteria are met Laboratory Analyst BCORG020<br />
Friable – one blank side<br />
daily or every 50 samples,<br />
whichever is less.<br />
Non-friable – one<br />
asbestos containing<br />
material (ACM) or nonfriable<br />
material every 20<br />
samples.<br />
RRF ≥ 0.05, %D±25%<br />
All analytes within ±10%<br />
of expected value. r ≥<br />
0.995.<br />
All analytes within + 10%<br />
of expected value<br />
RSD of replicate<br />
integrations: < 5%<br />
All analytes within + 10%<br />
of expected value<br />
RSD of replicate<br />
integrations < 5%<br />
Repeat CCAL once; repeat ICAL if<br />
second CCAL fails<br />
Prepare fresh standard and re-analyze<br />
ICV to rule out standard degradation or<br />
inaccurate injection. If problem persists,<br />
then per<strong>for</strong>m instrument adjustment<br />
and/or maintenance to correct the<br />
problem and repeat ICAL.<br />
If RSDs 5%, then per<strong>for</strong>m<br />
instrument maintenance to correct the<br />
problem and repeat ICAL.<br />
If RSDs 5%, then per<strong>for</strong>m<br />
instrument maintenance to correct the<br />
problem. Recalibrate and reanalyze all<br />
samples since last successful CCV.<br />
Laboratory Analyst<br />
Laboratory Analyst<br />
Laboratory Analyst<br />
Laboratory Analyst<br />
Negative Prepare and analyze another blank. Laboratory Analyst 1265<br />
BCORG020<br />
BCMET013<br />
BCMET013<br />
BCMET013<br />
Final Sampling and Analysis Plan<br />
Installation Restoration Site 29, Hangar 1<br />
Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>, Cali<strong>for</strong>nia<br />
DCN: AMEC-8816-0005-0039<br />
April 2010<br />
Page 24-2