WORKSHEET #7:<br />
PERSONNEL RESPONSIBILITIES <strong>AND</strong><br />
QUALIFICATIONS<br />
This worksheet identifies key project personnel associated with each organization,<br />
contractor, and subcontractor participating in responsible roles. Specific personnel roles<br />
and responsibilities are described in this worksheet.<br />
Name<br />
Table 7-1. Key Personnel Project Responsibilities<br />
Title/Role<br />
Organizational<br />
Affiliation<br />
Angela Lind Navy RPM Navy, BRAC<br />
Narciso Ancog<br />
Gary Munekawa<br />
David Smith<br />
Sarah Kloss<br />
Elizabeth Wells<br />
Mike Schulz<br />
Ann Bernhardt<br />
Navy QAO<br />
Navy ROICC<br />
Navy ROICC<br />
EPA RPM<br />
Water Board<br />
Project<br />
Manager<br />
Project<br />
Manager<br />
Program<br />
QCM<br />
Navy,<br />
NAVFAC SW<br />
Navy, NAVFAC<br />
SW<br />
Navy, NAVFAC<br />
SW<br />
EPA,<br />
Region IX<br />
San Francisco<br />
Water Board<br />
AMEC<br />
AMEC<br />
Mary Schneider Project QCM AMEC<br />
Mark Maniaci<br />
Chris Miele<br />
Construction<br />
Manager<br />
Site Safety &<br />
Health<br />
Supervisor<br />
AMEC<br />
AMEC<br />
Responsibilities<br />
RPM is the Navy manager directly responsible <strong>for</strong><br />
project execution and coordination with base<br />
representatives, regulatory agencies and the<br />
NAVFAC SW management team.<br />
Provides government oversight of the QA program,<br />
including review and sign-off on SAPs. The QAO has<br />
the authority to suspend affected projects activities if<br />
NAVFAC SW-approved quality requirements are not<br />
maintained.<br />
Provides site access and en<strong>for</strong>cement of SAP, APP<br />
and SHSP.<br />
Provides site access and en<strong>for</strong>cement of SAP, APP<br />
and SHSP.<br />
Manages the oversight of the project <strong>for</strong> EPA,<br />
Region IX.<br />
Manages the oversight of the project <strong>for</strong> the San<br />
Francisco Water Board.<br />
Supervises and coordinates all work per<strong>for</strong>med on<br />
the project. These responsibilities include project<br />
planning and execution, scheduling, staffing, data<br />
evaluation, report preparation, subcontracts, and<br />
managing deliverables.<br />
Assures the SAP is compliant with Navy and<br />
applicable regulatory requirements.<br />
Oversees and directs QA reviews <strong>for</strong> this project,<br />
including periodic reports, analytical program<br />
requirements, and schedules be<strong>for</strong>e submittal to the<br />
Navy <strong>for</strong> review and comment.<br />
Manages all field tasks.<br />
Responsible <strong>for</strong> development and implementation of<br />
the APP and SHSP.<br />
Final Sampling and Analysis Plan<br />
Installation Restoration Site 29, Hangar 1<br />
Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>,<br />
Cali<strong>for</strong>nia<br />
DCN: AMEC-8816-0005-0039<br />
April 2010<br />
Page 7-1