24.04.2015 Views

FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field

FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field

FINAL SAMPLING AND ANALYSIS PLAN - Documents for Moffett Field

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Instrument/<br />

Equipment<br />

ICP<br />

ICP<br />

Maintenance<br />

Activity<br />

Interference<br />

check<br />

solutions/interfer<br />

ence check<br />

solution – A<br />

(ICS/ICS-A)<br />

ICAL<br />

blank/CCAL<br />

blank (ICB/CCB)<br />

Testing<br />

Activity<br />

Instrument<br />

Per<strong>for</strong>mance<br />

Instrument<br />

Per<strong>for</strong>mance<br />

Inspection<br />

Activity<br />

Con<strong>for</strong>manc<br />

e to<br />

interference<br />

check<br />

Instrument<br />

contaminati<br />

on check<br />

Frequency<br />

Prior to<br />

sample<br />

analysis<br />

After every<br />

calibration<br />

verification<br />

Acceptance Criteria<br />

Within + 20% of<br />

expected value<br />

No analytes detected<br />

greater than (>) three<br />

times instrument<br />

detection limit (IDL)<br />

Corrective<br />

Action<br />

Terminate<br />

analysis,<br />

reanalyze<br />

ICS to rule<br />

out standard<br />

degradation<br />

or<br />

inaccurate<br />

injection. If<br />

problem<br />

persist, then<br />

per<strong>for</strong>m<br />

instrument<br />

maintenanc<br />

e, repeat<br />

calibrations,<br />

and<br />

reanalyze all<br />

associated<br />

samples.<br />

Determine<br />

possible<br />

source of<br />

contaminati<br />

on and<br />

apply<br />

appropriate<br />

measure to<br />

correct the<br />

problem.<br />

Reanalyze<br />

calibration<br />

blank and all<br />

associated<br />

samples.<br />

Responsible<br />

Person<br />

Laboratory<br />

Analyst<br />

Laboratory<br />

Analyst<br />

SOP<br />

Reference<br />

BCMET013<br />

BCMET013<br />

Final Sampling and Analysis Plan<br />

Installation Restoration Site 29, Hangar 1<br />

Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>, Cali<strong>for</strong>nia<br />

DCN: AMEC-8816-0005-0039<br />

April 2010<br />

Page 25-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!