2. Place the auger bit in the selected location and turn the auger until the 0.5 foot (6-<br />

inch) depth is obtained. Remove auger and collect sample from bit into a clean 8-<br />

ounce glass sample jar. Close the jar, label and place in cooler.<br />

2. Replace the auger bit into the original hole and continue augering until the 1 foot<br />

depth is reached. Remove auger and collect sample as above. Place excess soil back<br />

to the hole. Label a wooden stake with the sample number to mark the location <strong>for</strong><br />

confirmation sampling.<br />

3. Complete chain-of-custody record be<strong>for</strong>e taking the next sample.<br />

4. Place sample containers in an insulated cooler with ice.<br />

5. Samples will be packaged and shipped in accordance with SOP FP-F-7, Sample<br />

Handling, Storage, and Shipping (Appendix A).<br />

14.2.2 Pre-construction/Baseline Sediment Sampling Procedure<br />

Sediment samples will be collected from a shallow trench with disposable scoops. A new<br />

pair of nitrile gloves will be worn prior to sample collection. Nitrile gloves will be<br />

disposed of after each sample is collected, and a new pair will be worn be<strong>for</strong>e the next<br />

sample is collected to avoid possible cross-contamination.<br />

Using a new, individually packaged, disposable plastic scoop or equivalent, place sediment<br />

into an 8-ounce glass jar. Affix a completed sample label to the sample container. Wrap<br />

glass jar in bubble-wrap packaging material, place into resealable bags, and place sample<br />

containers into a cooler containing ice. Record sample number, time and date, and<br />

requested analysis on chain-of-custody <strong>for</strong>m. Samples will be packaged and shipped in<br />

accordance with SOP FP-F-7, Sample Handling, Storage, and Shipping procedure<br />

provided in Appendix A.<br />

14.2.3 Post-Construction Confirmation Soil Sampling Procedure<br />

The following is the soil sampling procedure <strong>for</strong> post-construction confirmation<br />

samples:<br />

1. Don a new pair of nitrile gloves.<br />

2. Place the auger bit in the selected location and turn the auger until 6-inch depth<br />

below surface is obtained. Remove auger and place soil in a stainless steel mixing<br />

bowl and homogenized. Then, place mixed soil into a clean 8-ounce glass sample<br />

jar. Close the jar, label and place in cooler.<br />

3. Label a wooden stake with the sample number to mark the location <strong>for</strong><br />

confirmation sampling.<br />

Final Sampling and Analysis Plan<br />

Installation Restoration Site 29, Hangar 1<br />

Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>,<br />

Cali<strong>for</strong>nia<br />

DCN: AMEC-8816-0005-0039<br />

April 2010<br />

Page 14-4