WORKSHEET #17: <strong>SAMPLING</strong> DESIGN <strong>AND</strong> RATIONALE<br />

Samples collected during this project will include baseline soil/sediment samples collected<br />

prior to construction and confirmation soil, wipe, and sediment samples collected once the<br />

removal action is completed. Details on the sampling design and rationale are presented<br />

below.<br />

Baseline/Pre-Construction Samples:<br />

Pre-construction samples will be collected from soil areas immediately adjacent to Hangar<br />

1 and from the sediment in the stormwater trench/conveyance system around the perimeter<br />

of Hangar 1. The purpose of the pre-construction soil and sediment samples is to establish<br />

baseline concentrations of PCBs, lead, and asbestos. Baseline/pre-construction<br />

concentrations will be compared to confirmation soil samples to verify that contaminants<br />

were not released into the environment as the result of the removal action.<br />

The scope of the soil sampling ef<strong>for</strong>t is restricted to the area of the soil immediately<br />

adjacent to (east of) Hangar 1. This area is approximately 21,000 ft 2 . The rationale <strong>for</strong><br />

limiting the soil sampling ef<strong>for</strong>t to this area is based on the following:<br />

• This is the only unpaved area within the project site.<br />

• Hangar 1 is surrounded by a perimeter storm water collection trench which<br />

prevents surface water from leaving the project site.<br />

• The nearest unpaved area is 300 feet North of Hangar 1.<br />

• Hangar 1 is in an industrial land use area and there are no sensitive habitats nearby<br />

(see Worksheet 10).<br />

Soil samples will be collected from 51 locations from soil areas on the east side of the<br />

Hangar. Sample locations are shown in Figure 11-1. At each location, soil samples will be<br />

collected from 0-6 inches (surface) and 6-12 inches below ground surface (bgs). Surface<br />

samples will be analyzed <strong>for</strong> PCBs, lead, and asbestos. If the concentration of PCBs in the<br />

surface sample is above 1000 ug/kg, then the 6-12 inch sample will be analyzed <strong>for</strong> PCBs<br />

to determine the vertical extent of the PCB contamination. Additional samples will be<br />

collected at 6-inch intervals to determine the depth of PCB contamination. Results of<br />

baseline/pre-construction samples will be provided to EPA and Water Board <strong>for</strong><br />

consultation and concurrence on areas requiring soil removal if PCB concentrations exceed<br />

1000 ug/kg.<br />

Four baseline/pre-construction sediment samples will also be collected from the<br />

stormwater trench/conveyance system. Locations will be selected based on where there is a<br />

sufficient amount of sediment present <strong>for</strong> sample collection. Soil and sediment samples<br />

will be collected using the procedure described in Worsheet 14.<br />

Final Sampling and Analysis Plan<br />

Installation Restoration Site 29, Hangar 1<br />

Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>,<br />

Cali<strong>for</strong>nia<br />

DCN: AMEC-8816-0005-0039<br />

April 2010<br />

Page 17-1