Worksheets 11, 14, 15, 17<br />

Worksheets 11, 14, 15, 17<br />

locations were selected randomly<br />

and edit the sampling approach to<br />

include analyzing all samples at<br />

once instead of a step-out approach.<br />

The soil decision units is (are) not<br />

clearly defined. Step 5 of Table 11-<br />

1 states that the contaminated soil at<br />

the area where exceedance was<br />

detected will be removed. However,<br />

the boundaries of the area that<br />

would be removed are not indicated<br />

in the SAP. Revise the SAP to<br />

define the decision units <strong>for</strong> the<br />

potential soil excavation areas.<br />

Please eliminate the references to<br />

the 95% confidence levels <strong>for</strong><br />

confirming the removal action has<br />

not impacted soil. The comparison<br />

between baseline and post- removal<br />

levels should be conducted on a<br />

point by point basis with regulatory<br />

consultation. The 95% confidence<br />

interval approach may average over<br />

too large of an area to be able to<br />

The Pre-Final Draft will define the<br />

soil decision units and boundaries<br />

of excavation areas. A grid<br />

approach will be adopted <strong>for</strong><br />

baseline and confirmation<br />

sampling. In general, if an<br />

exceedance occurs at any sample<br />

location, the soil will be excavated<br />

half way to the next clean location,<br />

in each direction. Confirmation<br />

samples will then be collected<br />

from the bottom of the excavation,<br />

at the center and on all four sides<br />

of the excavation. Sample results<br />

will be provided to both EPA and<br />

Water Board <strong>for</strong> consultation on<br />

the specific soil removal approach.<br />

Text references to the 95% will be<br />

removed. The comparison between<br />

baseline and post- removal levels<br />

will be conducted on a point by<br />

point basis in consultation with<br />

EPA and the Water Board.<br />

Response to Comments on Draft Sampling and Analysis Plan<br />

<strong>Moffett</strong> <strong>Field</strong>, Cali<strong>for</strong>nia<br />

DCN: AMEC-8816-0005-0040<br />

April 2010<br />

Page 3 of 10