Worksheets 11, 14, 15, 17<br />
Worksheets 11, 14, 15, 17<br />
locations were selected randomly<br />
and edit the sampling approach to<br />
include analyzing all samples at<br />
once instead of a step-out approach.<br />
The soil decision units is (are) not<br />
clearly defined. Step 5 of Table 11-<br />
1 states that the contaminated soil at<br />
the area where exceedance was<br />
detected will be removed. However,<br />
the boundaries of the area that<br />
would be removed are not indicated<br />
in the SAP. Revise the SAP to<br />
define the decision units <strong>for</strong> the<br />
potential soil excavation areas.<br />
Please eliminate the references to<br />
the 95% confidence levels <strong>for</strong><br />
confirming the removal action has<br />
not impacted soil. The comparison<br />
between baseline and post- removal<br />
levels should be conducted on a<br />
point by point basis with regulatory<br />
consultation. The 95% confidence<br />
interval approach may average over<br />
too large of an area to be able to<br />
The Pre-Final Draft will define the<br />
soil decision units and boundaries<br />
of excavation areas. A grid<br />
approach will be adopted <strong>for</strong><br />
baseline and confirmation<br />
sampling. In general, if an<br />
exceedance occurs at any sample<br />
location, the soil will be excavated<br />
half way to the next clean location,<br />
in each direction. Confirmation<br />
samples will then be collected<br />
from the bottom of the excavation,<br />
at the center and on all four sides<br />
of the excavation. Sample results<br />
will be provided to both EPA and<br />
Water Board <strong>for</strong> consultation on<br />
the specific soil removal approach.<br />
Text references to the 95% will be<br />
removed. The comparison between<br />
baseline and post- removal levels<br />
will be conducted on a point by<br />
point basis in consultation with<br />
EPA and the Water Board.<br />
Response to Comments on Draft Sampling and Analysis Plan<br />
<strong>Moffett</strong> <strong>Field</strong>, Cali<strong>for</strong>nia<br />
DCN: AMEC-8816-0005-0040<br />
April 2010<br />
Page 3 of 10