WORKSHEET #37: USABILITY ASSESSMENT<br />

A data usability report will be prepared by AMEC incorporating the findings of the data<br />

validation ef<strong>for</strong>t, evaluation of the data against the DQOs specified in this SAP, and other<br />

supporting in<strong>for</strong>mation. This assessment will evaluate data on a matrix-specific, analytespecific<br />

and location-specific basis. The potential impact of any sampling discrepancies or<br />

data qualifications (rejected, nondetected, estimated) on the removal actions will be<br />

discussed with the remedial program manager (RPM) and QAO. Recommendations <strong>for</strong><br />

further actions will be provided, if necessary and appropriate.<br />

Elements that will be addressed in the usability report include, but are not limited to:<br />

• Compliance of sampling methods with the SAP<br />

• Completeness of sampling ef<strong>for</strong>t<br />

• Potential sampling error<br />

• Compliance of analyses with SAP methods and QC requirements<br />

• Completeness of laboratory analyses<br />

• Potential analytical error<br />

• Corrective actions and resolutions<br />

• Validation findings<br />

• Measurement per<strong>for</strong>mance criteria<br />

• Remedial options<br />

Completeness of sampling will be determined by the number of samples collected divided<br />

by the number of samples to be collected as specified in the SAP, expressed as a<br />

percentage. The requirement of completeness is 95% <strong>for</strong> sampling.<br />

Completeness <strong>for</strong> laboratory analyses will be determined by the number of valid results<br />

(results not qualified with a rejected (R) flag) divided by the number of possible individual<br />

analyte results, expressed as a percentage. The requirement <strong>for</strong> analytical completeness is<br />

95%.<br />

Assessment activities are presented below.<br />

Final Sampling and Analysis Plan<br />

Installation Restoration Site 29, Hangar 1<br />

Former Naval Air Station, <strong>Moffett</strong> <strong>Field</strong>, <strong>Moffett</strong> <strong>Field</strong>, Cali<strong>for</strong>nia<br />

DCN: AMEC-8816-0005-0039<br />

April 2010<br />

Page 37-1