Developement Of A Batch Mode For Conduit And Its ... - Cal Poly
Developement Of A Batch Mode For Conduit And Its ... - Cal Poly
Developement Of A Batch Mode For Conduit And Its ... - Cal Poly
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
optimization could be monitored, and the optimization was started. <strong>Batch</strong> <strong>Mode</strong> then<br />
progressed through the list of cases, optimizing each one.<br />
Figure 63 – Initial Run <strong>Mode</strong> optimization<br />
The results of the batch run can be seen on the Run <strong>Mode</strong> GUI in Figure 63. All<br />
cases ended in Phase 3, due to the dp=0 condition. As such, all cells of the Phase column<br />
were colored green. The Optimization Result Message column also indicated successful<br />
optimizations.<br />
3.3.3 Gain Schedule Results<br />
After all the cases had been run, <strong>Batch</strong> <strong>Mode</strong> was switched to Analysis <strong>Mode</strong> to<br />
view the results. Typically, the user would view the results of the HQ Window, flipping<br />
quickly between cases, to ensure each case ran properly. <strong>For</strong> the sake of being concise,<br />
107