22.06.2015 Views

Developement Of A Batch Mode For Conduit And Its ... - Cal Poly

Developement Of A Batch Mode For Conduit And Its ... - Cal Poly

Developement Of A Batch Mode For Conduit And Its ... - Cal Poly

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 65 - Gain Schedule plots against velocity<br />

The results of the initial gain schedule plot left much to be desired. At first<br />

glance, it appears to be anything but ordered, however a few patterns were discovered<br />

that led to the cause of the poor results. From the sensitivity logs of the individual cases,<br />

it was learned that the attitude and rate feedback gains, dpp_RAHA and dpp_RAHAR<br />

were the most active design parameters. It was then curious why these two parameters<br />

wouldn’t have smooth gain schedules. However, the schedules from 0-50kts and 60-<br />

90kts seem to follow either increasing or decreasing patterns. Between 50kts and 60kts,<br />

the design parameters of both cases change drastically. Since 60kts was one of the three<br />

identified points used in the interpolation, it was theorized that the linear interpolation<br />

109

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!