10.07.2015 Views

OPERATOR'S MANUAL - The Baker Company Blog

OPERATOR'S MANUAL - The Baker Company Blog

OPERATOR'S MANUAL - The Baker Company Blog

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

366D000M 1/4/2011TopBypass bracket assembly(Typical other end)HingeFlapBottomDetail ‘B’Step# 8: Connect flap sensorwiring coming out the back rightside of the CEC to the connectorcoming out the top right side ofthe cabinet dress panel.Flap sensor wiringSensor wiring connectorStep# 9: Before attaching the cabinet to the building exhaust system verify that the required airflow and staticpressure are available at the connection point.Step# 10: Position the cabinet inthe room and connect the cabinetto the building exhaust ducting.<strong>The</strong> *FlexAIR CEC must behard mounted to the buildingexhaust duct.<strong>The</strong> CEC comes with a 12”diameter flanged connection andinner 10” diameter spun baffle.<strong>The</strong> connection has studs equallyspaced for attaching to a flangedexhaust duct. You should neverconnect to the spun baffle.<strong>Baker</strong> offers optional flangedexhaust collar connections & airtight dampers.Optional 12” short collarOptional 12” to 10”transition collarWith the CEC installed and connected to the building exhaust system the cabinet should be certified by aqualified technician to assure proper cabinet performance. [See Operating Instructions for *FlexAIR CEC]*- FlexAIR CEC is Patent Pending96

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!