10.07.2015 Views

OPERATOR'S MANUAL - The Baker Company Blog

OPERATOR'S MANUAL - The Baker Company Blog

OPERATOR'S MANUAL - The Baker Company Blog

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

366D000M 1/4/20118. Make sure all plastic sheeting seams arefirmly taped to the cabinet so that there areno leaks. (See Figures 15 and 16)Figure 15Figure 1610. After the cabinet is sealed for decontamination, turn on the formaldehyde generator/neutralizercontaining the paraformaldehyde, water and ammonium by pressing the receptacle button on the cabinettouch pad.11. After 25% of the paraformaldehyde has depolymerized, turn on the cabinet blower for 10 to 15 seconds.Repeat after 50%, 75% and 100% of the paraformaldehyde has depolymerized.12. Allow the formaldehyde gas a minimum residence time of 6 hours, preferably over night (12 hours).13. Turn on the cabinet blower after the ammonium bicarbonate or ammonium carbonate cycle has finished31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!