10.07.2015 Views

OPERATOR'S MANUAL - The Baker Company Blog

OPERATOR'S MANUAL - The Baker Company Blog

OPERATOR'S MANUAL - The Baker Company Blog

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

366D000M 1/4/2011Operating Instructions for *FlexAIR Canopy Exhaust Connection (CEC)IMPORTANT• Only qualified technicians should perform this procedure.• *FlexAIR must be hard mounted to building exhaust ducting.• Carcinogens and other toxins present a unique chemical deactivation problem and the standardbiological decontamination will not be effective against chemicals or other non-biologicalmaterials. With materials of this kind, consult a qualified safety professional.10” Diameter spun baffleFront CEC flapBuilding exhaust duct12” Diameterexhaust connection‘A’Biological Safety Cabinet with*FlexAIR CEC installed.Top of cabinet with *FlexAIR CECBypass bracketassembly.(Typical other end)End flapDetail ‘A’*FlexAIR CEC OperationStep# 1: Before attaching the cabinet to the building exhaust system verify that the required airflow and staticpressure are available at the connection point. Follow the installation instructions for connecting the *FlexAIR CECto the cabinet.97

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!