10.07.2015 Views

OPERATOR'S MANUAL - The Baker Company Blog

OPERATOR'S MANUAL - The Baker Company Blog

OPERATOR'S MANUAL - The Baker Company Blog

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

366D000M 1/4/20115) Repeat steps 3 & 4 on the other end of the cabinet.IMPORTANTIf the caster option is provided be sure to chock the previously installed casters [toprevent cabinet movement] before repeating steps 3 & 4.Raising the Unit to 30 1/8” [765mm] Work Surface Height: Adjustable Leg LevelerOptionRaising the Unit to 30” [762mm] Work Surface Height: Caster Option6) Lift one end of the cabinet up a minimum of 5” [127mm] and block in position.7) Unscrew the bolts (One per leg) that hold the legs in the shipping position.8) Slide the leg out of the stand until the holes line up at the next position.Lift end upItems 2, 3 & 4Extend leg downBlocking81

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!