10.07.2015 Views

OPERATOR'S MANUAL - The Baker Company Blog

OPERATOR'S MANUAL - The Baker Company Blog

OPERATOR'S MANUAL - The Baker Company Blog

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

366D000M 1/4/2011IV - ONSITE CHECKS AND MAINTENANCE PROCEDURESWe recommend that the following checks be performed before initial use, after relocation, and after eachfilter change. <strong>The</strong>y should also be carried out at regular intervals, usually six months or one year, as specifiedby an industrial hygienist, safety officer or other qualified person. <strong>The</strong> tests described below meetrecommended minimum requirements and only experienced technicians using proper procedures andinstruments must perform them. Our representatives can tell you about other tests, which you may considerdesirable.As reported earlier in this manual, each individual cabinet made by <strong>The</strong> <strong>Baker</strong> <strong>Company</strong> is carefully testedbefore it leaves the factory. Your copy of the test report, which you will find at the back of this manual, givesthe factory test results for your own SterilGARD ® cabinet. Use it as your record of the original testing, and asyour guide to testing in the future. To gain many years of satisfactory service, please be sure that your maintenancepersonnel come as close as possible to duplicating these original test figures.Your test procedures should be identical to ours so that achieving similar test results and comparison of datawill be possible. Please correspond directly with us to request detailed procedures for your particular cabinetmodel. Alternate testing procedures can be found in the NSF International Standard No. 49.<strong>The</strong> Airflow BalanceWARNINGOnly qualified technicians should perform this procedure.<strong>The</strong> airflow balance, which is set at the factory, provides your cabinet with the proper air volume andvelocity control to minimize leakage of airborne contamination either into or out of the work area.In order to duplicate as closely as possible the airflow characteristics described in the original factory testreport, please follow these steps:1. Adjust the window to its designed opening height.2. Perform inflow velocity test per NSF 49. Specific details are on the cabinet instruction label and in thefactory test report.3. Perform down flow velocity test per NSF 49. Specific details are on the cabinet instruction label and inthe factory test report. NOTE: <strong>The</strong> IV bar and UV light bulb, if installed, need to be removed whileperforming down flow readings.4. Compare your results with those originally recorded at the factory.5. Your new <strong>Baker</strong> cabinet has been built with a new motor controller that should not need adjustment inthe field. If any motor blower adjustments are thought to be needed please call 1-800-992-2537 and askfor technical support. <strong>The</strong>se cabinets have been built with an internal balancing damper thatcompensates for downflow and exhaust/intake imbalances. This damper may be adjusted only by aqualified technician who has had proper training and has the proper equipment. [See Figure 17 andChart 1: “Type A2 Air Balancing Guidelines”]34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!