10.07.2015 Views

OPERATOR'S MANUAL - The Baker Company Blog

OPERATOR'S MANUAL - The Baker Company Blog

OPERATOR'S MANUAL - The Baker Company Blog

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

366D000M 1/4/20119) Bolt the leg in position with items 2, 3, and 4. (Two bolts per leg)10) Repeat steps 7 through 9 for the other leg then remove the blocking.11) Repeat steps 6 through 10 for the other end of the cabinet.Raising the Unit to the 38 5/8” [981mm] Work Surface Height: Adjustable Leg LevelerOptionRaising the Unit to the 36” [914mm] Work Surface Height: Caster Option12) Lift one end of the cabinet up a minimum of 7” [178mm] and block in position.13) Unscrew the bolts (Two per leg) that hold the legs in the current work surface heightposition.14) Slide the leg out of the stand until the holes line up at the next position.15) Bolt the leg in position with items 2, 3, and 4. (Two bolts per leg)16) Repeat steps 14 through 16 for the other leg then remove the blocking.17) Repeat steps 13 through 17 for the other end of the cabinet.FootRotate foot for fine adjustment to aid in leveling of cabinet82

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!