11.07.2015 Views

Hydraulic ram pumps and Sling Pumps

Hydraulic ram pumps and Sling Pumps

Hydraulic ram pumps and Sling Pumps

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(Name <strong>and</strong> address of contractor) _____hereinafter called 'Contractor' on the other part.Whereas the Employer is desirous of the erection <strong>and</strong> completion of a rainwater reservoir as areinforced brickwork structure, <strong>and</strong> has caused drawings of the work to be prepared, <strong>and</strong> whereassaid drawing Nos.____ have been signed by or on behalf of the Employer <strong>and</strong> the Contractor, thefollowing is hereby agreed:1. For consideration hereinafter mentioned, the Contractor will upon <strong>and</strong> subject to the conditionsannexed hereto as St<strong>and</strong>ard Specifications execute <strong>and</strong> complete the works shown <strong>and</strong> describedupon the said drawings, <strong>and</strong> as quoted for in the Bill of Quantities.2. The Employer will pay the Contractor the sum of____ (hereinafter referred to as the ContractSum) for the erection of the reinforced brickwork.3. Date of CompletionPossession of the site shall be given to the Contractor on or before (Day, Month, Year)____who shall thereupon <strong>and</strong> forthwith begin the works, <strong>and</strong> regularlyproceed with <strong>and</strong> complete the same on or before (Day, Month, Year) ____4. Damage <strong>and</strong> Non-CompletionIf the Contractor fails to complete the works by (Day, Month, Year)____or within any extended time given by the Employer in writing, the Contractor shall pay or allow to theEmployer as liquidated <strong>and</strong> ascertained damages the sum of_____ for every day of non-completion.The Employer may deduct such damages from anymoney due to the Contractor.5. Certificates of PaymentsThe Contractor shall be entitled to a Certificate of Payment on the day of commencing theconstruction work, not exceeding 33% of the Contract Sum. Final payment shall be due the day ofcompletion providing proof the mentioned structure is waterproof.Signed <strong>and</strong> deted by the Contractor_____________________________________1. As Witness (Date______________________ Signature ___________________)2. As Witness (Date______________________ Signature ___________________)Signed <strong>and</strong> deted by the Employer_______________________________________1. As Witness (Date______________________ Signature ___________________)2. As Witness (Date______________________ Signature ___________________)St<strong>and</strong>ard Specifications for Reinforced BricktanksMaterial <strong>and</strong> WorkmanshipThe whole of the works shall be carried out <strong>and</strong> completed in the best <strong>and</strong> most workmanlikemanner, <strong>and</strong> with the best materials of the kind respectively specified. No second-h<strong>and</strong> materialsshall be used.ProtectionThe Contractor shall protect all materials <strong>and</strong> work from damage during the progress of the works,until completion <strong>and</strong> h<strong>and</strong>over.69

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!