11.07.2015 Views

Hydraulic ram pumps and Sling Pumps

Hydraulic ram pumps and Sling Pumps

Hydraulic ram pumps and Sling Pumps

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6% clay, silt, etc. Before commencing work, the quality of the s<strong>and</strong> shall be proven by test, <strong>and</strong>submitted to the Clerk of Works. After the float-frushed screed has been watered for 24 hours, thenil coat shall be applied, using a steel trowel.Waterproof PlasterThree-Coat PlasterFirst Coat: 10 -15 mm cement plaster of one part cement <strong>and</strong> three parts river s<strong>and</strong> screenedthrough a 3-mm sieve screen shall be wooden-float-finished.Second Coat: 5 -8 mm cement plaster mixture, as described in First Coat above, shall be screenedthrough a 1.5-mm sieve screen.Third Coat: This shall be a nil coat composed of pure cement with a consistency of water, <strong>and</strong> shallbe steel-trowel-finished. The plaster shall be cured after each coat has been applied, <strong>and</strong> when thethird (nil) coat has been applied, it shall be covered with waterproof material or soaked thoroughlyfor seven days.Bill of QuantitiesQuantity UnitRate AmountEarth: Excavate oversite average 100 mm deep to remove vegetable soil, remove, m²<strong>and</strong> deposit according to Employer's advice, not exceeding 50 mEarth: Excavate foundation trench to 'Barth' not exceeding 0.50 m deep <strong>and</strong> remove, m³part-return, fill in <strong>and</strong> <strong>ram</strong> around foundationEarth: Additional excavations for trenches to reach stable ground m³Earth: Additional excavation for inner circle to reach stable ground m³Earth: Backfilling <strong>and</strong> <strong>ram</strong>ming of hardcore approved material in layers not exceeding m³200 mmEarth: Lean concrete for backfilling: 1 part cement: 2 parts river s<strong>and</strong>: 4 parts gravel m³Reinforcement: Supply <strong>and</strong> place reinforcement cage for ring foundation <strong>and</strong> weldedreinforcement mesh for bottom slab consisting ofMild steel rods Ø 20 m²Mild steel rods Ø8mWelded reinforcement meshmConcrete: 1 :2 :1 -20-mm aggregate as specified in ring foundation <strong>and</strong> slab m³compacting by mechanical vibratorReinforced Brickwork: 240-mm brick wall in cross bond reinforced vertically by10-mm mild steel rods <strong>and</strong> horizontally by 6-mm mild steel rodsBrick wall m²Mild steel rods Ø10mMild steel rods Ø6mWaterproof cement plaster consisting of 3 coats as specified, inclusive curing m²Concrete Slab Seating: Plaster of the wall top steel-trowel-finished <strong>and</strong> placing of 2layers plastic sheeting to provide for sliding joint under roof slabReinforcement of Roof Slab: Supply <strong>and</strong> place mild steel reinforcement cage for rooflintel <strong>and</strong> welded reinforcement mesh for roof slab consisting ofMild steel rods Ø6mMild steel rods Ø20mWelded mesh m²Formwork <strong>and</strong> Concreting Roof Slab: Concrete 1: 2: 1 as specified compacting by m²mechanical vibratorSupply <strong>and</strong> place water tap unit according to drawing 1 NºSupply <strong>and</strong> place overflow 150 mm Øasbestos pipe of 800 mm length provided with 1 Nºgalvanized gauze wire coverSupply <strong>and</strong> place manhole cover 600/450 mm cast iron painted 3 times with 1 Nº73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!