12.07.2015 Views

Promoting youth entrepreneurship in Lagos, Nigeria - SNHU ...

Promoting youth entrepreneurship in Lagos, Nigeria - SNHU ...

Promoting youth entrepreneurship in Lagos, Nigeria - SNHU ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.0 Monitor<strong>in</strong>g and Evaluation5.1 IntroductionThe M&E plan <strong>in</strong>cludes a table that organizes data collection by type of data, frequency ofcollection, collection methodology, the target population and the personnel responsible for datacollection.5.2 Performance Measurement Framework: (PMF)For projects like this with the collaboration component, Learn<strong>in</strong>g (L) is added so that lessonslearned are fully captured and used to make changes <strong>in</strong> implementation, or avoid mistakes whenreplicat<strong>in</strong>g or scal<strong>in</strong>g-up. To meet the special needs of this project, a Learn<strong>in</strong>g, Monitor<strong>in</strong>g andEvaluation (LME) framework will be an <strong>in</strong>tegral component of the project. The first steps <strong>in</strong> theLME framework are ref<strong>in</strong><strong>in</strong>g strategic goals for targeted beneficiaries; quantify<strong>in</strong>g targets; redef<strong>in</strong><strong>in</strong>gor sharpen<strong>in</strong>g <strong>in</strong>dicators; and l<strong>in</strong>k<strong>in</strong>g them to the strategic objectives.The f<strong>in</strong>alactivities for the LME will <strong>in</strong>clude design<strong>in</strong>g data collection <strong>in</strong>struments, systematicallycollect<strong>in</strong>g data, and operationaliz<strong>in</strong>g the framework. While learn<strong>in</strong>g and monitor<strong>in</strong>g are ongo<strong>in</strong>gactivities, a full-scale mid-term evaluation will be conducted at the last quarter of project and af<strong>in</strong>al impact evaluation at the end of the Year.Cont<strong>in</strong>uous monitor<strong>in</strong>g of the project implementation was applied throughout the projectduration. At the start of the project a monitor<strong>in</strong>g plan for implementation activities was developedbased on periodicity of events (quarterly) and on decision-mak<strong>in</strong>g (corrective action, reviewmeet<strong>in</strong>gs, etc.). This plan <strong>in</strong>cludes a) the <strong>in</strong>dicators, b) the source of data, frequency of collectionand the responsibility for collection and c) the report format, and the <strong>in</strong>dividuals responsible for68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!