12.07.2015 Views

Environmental & Social Management Framework - About ...

Environmental & Social Management Framework - About ...

Environmental & Social Management Framework - About ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Environmental</strong> and <strong>Social</strong> <strong>Management</strong> <strong>Framework</strong>At this early stage, quick environmental overview/reconnaissance or preliminaryenvironmental study can indicate, whether any of the alternatives proposed areenvironmentally harmful, such as• identification of "viable" alternatives (from an environmental viewpoint), and• provision of an early indication of likely significant impacts for further EIAwork.STEP 2:PROJECT SCOPINGIn Nepal, projects to be considered for application of IEE and EIA are listed in theSchedule 1 and Schedule 2 related to Rule 3 of <strong>Environmental</strong> Protection Rule,1997 (first amendment, 1999) of GoN. The legal criteria are shown in Tab. 2.3.Accordingly; all road development projects must be considered for conductingeither an IEE or a full EIA, depending on their length, project costs and, above all,f they are new constructions or just rehabilitation and upgrading works. For thesub-projects pertaining to this ESMF, all but one fall in the category of IEE.Table 2.3: Legal Criteria for Selecting an IEE or EIA in the RoadSector, and comparison of requirements prescribed by the GoN andthe WBType of ProjectType of EARequiredEA Categoryas per WBConstruction of National Highways EIA AConstruction of Major Feeder Roads EIA AConstruction of Minor Feeder Roads IEE BConstruction of District Roads IEE BConstruction of Urban Roads IEE BConstruction of Rural Roads IEE BConstruction of 1 to 5 km long Ropeways IEE BConstruction of more than 5 km long Ropeways EIA AConstruction of 1 to 5 km long Cable Car IEE BConstruction of more than 5 km long Cable Car EIA AConstruction of Major Bridges IEE BConstruction of Minor or Medium Bridges EXEMPTED CConstruction of Tunnels IEE BRoutine, Recurrent, Periodic, and Emergency Maintenance EXEMPTED CUpgrading, Rehabilitation and Reconstruction of National HighwaysIEEBand Feeder RoadsAny Project which requires Deforestation, Clearance Felling orRehabilitation of National Forest of an Area up to 5 Hectares IEE BAny Project which requires Deforestation, Clearance Felling orRehabilitation of National Forest of an Area more than 5 Hectares EIA AAny Projects which is to be constructed within Sensitive Area(Historical, Cultural and Archaeological; Ecologically Sensitive andWetland Area; National Park, Wildlife Sanctuaries and ConservationArea; Semi-arid, Mountainous and Himalayan Regions; Flood-Proneand other Dangerous Areas; Residential, School and Hospital Areas;Areas that are main source of public water supply)Project with investment cost of Rs. 10 million to 100 millionIEEBProject with investment cost of over Rs. 100 million EIA ASource: EPR, 2054 (Schedule 1& 2 pertaining to Rule 3), and MoPE ‘Additional Notice’, Nepal Gazette August23, 1999. See also Public Works Directives, 2002, Part I, §3.2 (p. 3-1)EIAAChapter 2-6 April 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!