12.07.2015 Views

Environmental & Social Management Framework - About ...

Environmental & Social Management Framework - About ...

Environmental & Social Management Framework - About ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Environmental</strong> and <strong>Social</strong> <strong>Management</strong> <strong>Framework</strong>Issue Verification Schedule ResponsibilityPlantation of vegetation inthe cut slope.Timely construction ofother slope protectionmeasures, such as,retaining walls.Site inspection;As applicable, generatesocial forestry programCommunity-basedplanting / slopemaintenance programPeriodically, as peradequate season.Immediately afterconstruction.PM/DoR, Consultant,Contractor/RBG, socialforestry programPM/DoR, Consultant,Contractor communityprogramProper siting of food stalls,Camp sanitation facilitiesQuality of surface water,and groundwater levelchangesAir pollution nearsettlements.Damage to privateproperties.Protection of culturallysensitive spots.Operation and closure ofquarries and borrow pitsrequirements related tolocation, vegetationprotection, soilconservation, erosioncontrol, siltation, stabilityC. Operation PhaseEncroachment/degradationof forest.Encroachment intocommon property.Inappropriate use ofmarginal lands.Surface flow interruptionand its consequences.Air pollution, vehicularemission, noise, trafficvolume.Maintenance of road androad structures.Condition of environmentalmitigation measures usedin the road.Landscape aesthetics.Observation of thosesites.Use field kit/visualobservation.Observation of goodconstruction practices;discussion with residentsand workers.Observation anddiscussion with propertyowners.Site observation,discussion with localresidents.Site inspection,discussion with workersand local people.Visit identified forest,discussion with localpeople, forest usergroups, local forestauthority.Discuss with localpeople, prior mappingand seek consensus withcommunity leaders.Discuss with localpeople, reference to priormapping.Visit the area, mapping,discussion with localpeople.Travel along the road,discussion with localpeople, pedestrians,passengers, transportoperators.Inspection of road androad structures, checkmaintenance record.Inspection of suchmeasures and discussionwith maintenanceworkers.Observation, views oflocal people and touristsWeekly.Weekly or whenconstruction takingplace near waterbody.Periodically (weekly)Upon demand, bimonthlyUpon demand,Monthly.During quarryoperation or biweekly.Half Yearly.Upon demand, halfyearlyUpon demand, halfyearlyUpon demand, halfyearlyUpon demand, halfyearlyAnnuallyAnnuallyAnnuallyPM/DoR, Consultant,ContractorPM/DoR, Consultant,ContractorPM/DoR, Consultant,ContractorPM/DoR, Consultant,ContractorPM/DoR, Consultant,Contractor, VDC/DDCPM/DoR, Consultant,Contractor/RBGDistrict Road Office/DoR,VDC, CDOlocal forest authorityDistrict Road Office/DoR,VDC, CDODistrict Road Office/DoR,VDC, CDODistrict Road Office/DoR,ContractorDistrict Road Office/DoR,CBO/NGODistrict Road Office/DoR,Contractor/RBGGESU/DoRGESU/DoRApril 2007 Chapter 2-31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!