- Page 1 and 2: ADDENDUM XDATE: May 19, 2008TO:FROM
- Page 3 and 4: ( 0ORO t'The Unified Government of
- Page 5 and 6: R: No change to bid date.3- Q: (AG)
- Page 7 and 8: Part IGeneralSection 01 57 00Enviro
- Page 9: 005700-3Environmental and Property
- Page 13 and 14: List of Planholders, Athens North O
- Page 15 and 16: RADDENDUM IXDATE: May 16, 2008TO:FR
- Page 17 and 18: AGREEMENT BETWEENBUYER AND SELLERFO
- Page 19 and 20: * Delete page 00520-5 and replace w
- Page 21 and 22: otherwise.F. Should either party re
- Page 23 and 24: 4gas well as construction of the la
- Page 25 and 26: QUESTIONS AND RESPONSES NO. 5NORTH
- Page 27 and 28: Also on drawing 05-CD-1 typical roa
- Page 29 and 30: R: No change will be made to the do
- Page 31 and 32: R: Apply protective liner to all in
- Page 33 and 34: 16. Q: (AS)Section 0421.13 - Page 5
- Page 35 and 36: induction motor data sheet.a) Is th
- Page 37 and 38: conduit size for P39 to be 1-1/2".
- Page 39 and 40: R: No change will be made to the do
- Page 41 and 42: (TC)(TDC)(TDH)(TF)(TI)(TJL)(WGH)(WS
- Page 43 and 44: (1)Section 00 41 00BidTO:UNIFIED GO
- Page 45 and 46: 004100-3Bidf. Utility Location Allo
- Page 47 and 48: 004100-5BidIte No Decito Qty uni Un
- Page 49 and 50: 0041 00-7BidIte No. Decito t.UiSUi
- Page 51 and 52: 004100-9BidMAJOR PRODUCT OR SYSTEM
- Page 53 and 54: 0041 00-11BidThe Bidder agrees here
- Page 55 and 56: EQUIPMENT ALLOWANCE SCOPE OF WORKRE
- Page 57 and 58: March 7, 2008 Amended May 13, 2008T
- Page 59 and 60: System Controls:Not included in thi
- Page 61 and 62:
* No performance and laboratory tes
- Page 63 and 64:
C. Seller is familiar with and is s
- Page 65 and 66:
Project: Athens, GA North Oconee Ma
- Page 67 and 68:
ARTICLE 4 -BASIS OF PROPOSAL4.01 Pr
- Page 69 and 70:
Weir Specialty PumpsP.O. Box209 (84
- Page 71 and 72:
ATHENS, GA 7 NORTH OCONEE May 12,20
- Page 73 and 74:
Weir Specialty PumpsWEiRco PUMPWEMI
- Page 75 and 76:
1635W. Walnut StreetTU R B LEX Spri
- Page 77 and 78:
B. $ 33,658.00 The Seller's monthly
- Page 79 and 80:
Quotation # 08RAS-027-01Yancey Powe
- Page 81 and 82:
-k 0Quotation # O8RAS-027-01Yancey
- Page 83 and 84:
Quotation # OBRAS-027-01Yaney Power
- Page 85 and 86:
- Quotation # O8RAS-027-01Yaney pow
- Page 87 and 88:
Quotation #- OSRAS-027-01' Yancey25
- Page 89 and 90:
Quotation # 08RAS-027-01Yancey Povw
- Page 91 and 92:
NPMwerSystms.259 I.eeilndustrW Bilv
- Page 93 and 94:
Dubin, GregFrom:Sent:To:Cc:Subject:
- Page 95 and 96:
SUPPLEMENTARY CONDITIONS (Rev. 1)Th
- Page 97 and 98:
SC 15: Add the followtng paragraph:
- Page 99 and 100:
0 0 0C3) cm C C Ccm 0ES 20 ESw'-a m
- Page 101 and 102:
U) SL ct )0 nm 0UCV 0 LC,9 . Q o1 f
- Page 103 and 104:
QUESTIONS AND RESPONSES NO. 4NORTH
- Page 105 and 106:
would the OCP policy not be enough
- Page 107 and 108:
properties used in it methods allow
- Page 109 and 110:
12. Q: (TC) SECTION 31 23 60 - 5 ME
- Page 111 and 112:
R: Refer to 05-CU drawings and Spec
- Page 113 and 114:
R: See subsequent addenda.Zone 2 84
- Page 115 and 116:
actually a refractor 545 or if a re
- Page 117 and 118:
~vRk0 oRADDENDUM IIDATE: April 15,
- Page 119 and 120:
STANDARDGENERAL CONDITIONSOF THECON
- Page 121 and 122:
GENERAL CONDITIONSARTICLE 1 - DEFIN
- Page 123 and 124:
29. Notice to Proceed--A written no
- Page 125 and 126:
within the Contract Time, or extend
- Page 127 and 128:
others as appropriate will be held
- Page 129 and 130:
3.04 Amending and Supplementing Con
- Page 131 and 132:
a. reviewing and checking all such
- Page 133 and 134:
Documents. CONTRACTOR shall also fu
- Page 135 and 136:
5. allow for partial utilization of
- Page 137 and 138:
ARTICLE 6 - CONTRACTOR'S RESPONSIBI
- Page 139 and 140:
substitte item will perform adequat
- Page 141 and 142:
permits and licenses. CONTRACTOR sh
- Page 143 and 144:
esponse to such an emergency, a Wor
- Page 145 and 146:
1. is attributable to bodily injury
- Page 147 and 148:
8-05 Lands andEasements; Reports an
- Page 149 and 150:
accordance with the provisions of p
- Page 151 and 152:
such Claim, dispute, or other matte
- Page 153 and 154:
equipment brought to the Project if
- Page 155 and 156:
the ENGINEER and the other party to
- Page 157 and 158:
incorporation in the Work. Such ins
- Page 159 and 160:
ARTICLE 14 - PAYMENTS TO CONTRACTOR
- Page 161 and 162:
2. Should CONTRACTOR neglect to pay
- Page 163 and 164:
14.07 Final Payment ENGINEER will r
- Page 165 and 166:
Documents in connection with uncomp
- Page 167 and 168:
ADDENDUM VillDATE: May 15, 2008TO:F
- Page 169 and 170:
tRkzZRDrawings1. Delete Sheet 05-SE
- Page 171 and 172:
Copyright C 2 000National Society o
- Page 173 and 174:
AGREEMENT... THIS AGREEMENTi betwee
- Page 175 and 176:
6.04 Seller and Buyer shall execute
- Page 177 and 178:
D. The Contract Documents may only
- Page 179 and 180:
ATTACHMENT ASnecificationsSection T
- Page 181 and 182:
PROPOSAL FORMPRESELECTED EQUIPMENT
- Page 183 and 184:
ARTICLE 4 - BASIS OF PROPOSAL4.01 P
- Page 185 and 186:
PARKSON CORPORATIONUnanimous Writte
- Page 187 and 188:
Hanson, RickFrom:MAHONEY770@aol.com
- Page 189 and 190:
Furt-her,.p ease advise me ifyou wi
- Page 191 and 192:
Copyright 02000National Society of
- Page 193 and 194:
AGREEMENTTHIS AGREEMENT is between(
- Page 195 and 196:
6.04 Seller and Buyer shalt execute
- Page 197 and 198:
ARTICLE 11 - MISCELLANEOUS11.01 Def
- Page 199 and 200:
ATTACHMENT ASpecificationsSection T
- Page 201 and 202:
SIEMENSCOST PROPOSALOdor Control (B
- Page 203 and 204:
SIEMENSTABLE OF CONTENTSNo.Item Des
- Page 205 and 206:
ARTICLE 1- PROPOSAL RECIPIENT1.01 T
- Page 207 and 208:
6,02 The following documents are in
- Page 209 and 210:
SIEMENSSECTION 2SIEMENS' DETAILED S
- Page 211 and 212:
SIEMENSTransfbrmer, Circuit breaker