20.08.2015 Views

Subcontractors

ADDENDUM X

ADDENDUM X

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ARTICLE 4 - BASIS OF PROPOSAL4.01 Proposer will frnish the Goods and Special Services in accordance with these Contract Documents for th followingprice(s), which do not include sales tax:* $150,000 Shop Drwing Preparation. $2,770,000 Manucturing of Goods* S60,000 specialSWAM* $2,980,000 TOTAL Lump Sum4.02 Additional Proposed Costs-* $30,000 The Seller's monthly fee for storage of Goods at Seller's facilities in tie event that Buyerdesires to delay shipment beyond the shipment date stated below in Article 5.02. Such feeshall include interest on money due Seller* $7.000 The Seller's monthly fee for Buyer delaying the Initiation of manufacturing of Goods or fornot executing the Procurement Agreement within the time specified in 4.03 below4.03 Seller and Buyer shall execute the Procurement Agreement within 45 days after the Contractor's/Buyer's Notice toProceed from the Owner. Should the Procurement Agreement not be executed within said 45 days duo to the fault of the SBuyers.h Buyer shall be subject to the prorated additional costs identified in Paragraph 4.02 above. the " - IAgm~neo not be inat4d w'ig"i t; Wd 15 dot duo to tsi-n lt zftz elle, Seller *All be ot: to t:e Iiqnidatzd lowpo. A&mu-o.n prtifn. W cthepscirr" Am&.gcrt.. The issue of fiultwilt be determinedby the Engineer.ARTICLE 5 - TIME OF COMPLETION5.01 Proposer agrees that the fmishing of Goods and Special Services will conform to the schedules set forth below,which will be incorporated into Article 5 of the Agreement.Time required by Seller to prepare approvable Shop Drawings: 90 consecutive calendar days afterexecution of the Agreement between the Buyer and Seller.days.Time required by Seller after receipt of approved Shop Drawings to deliver all goods: 210 consecutive calendarTime required to complete anl Special Services: within 80consecutive calendar days after notificationfrom Buyer to Seller to commence such Special Services. Includes: Start-up, acclimation, performance testing and training of 9 bioscrubbers5.02 Proposer agrees that the prices in Article 4 above are based on the condition that shipment of goods may be delayedby the Buyer until December 1, 2009ARTICLE 6- PROPOSAL DOCUMENTS6.01 Ihe following documents are atached to and made a condition of this Proposal:Note 1: he successful Proposer (Seller) Is ultimately to receive an order from aA. Proposer's supporting data General Contractor (Buyer), and as such, It Is possible4probable that the Buyer willIssue a order with additional or different terms than that which Ser has beenafforded the opportunity to review and comment on at the Pre-Section phase. Senorhas no way of knowing the amount of time required to reach a mutnally agreeable setof conditions with Buyer in the event Buyer's conditions differ to those presented inthe RFP for Odor Control System Pre-Belection Equipment Allowance.EJCDC P1400 Proposal Form for Preuremeant ContractsCopyight @009, Nattonal Society of Professionad Enghneers. An rights reserved.00400-302001-158 Odor Control (Blotower) System

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!