2. a preliminary schedule ef Shep Dr.ing and Sampl2.03 Commencement of Contract Times; Notice to ssubmittals schedule which wi4i4listindicates each requiredProceedsibmital-Submittal and the datestimes for submitting, timefor reviewing; and processing sucach Ssubmittal (periodicA. The Contract Times will commence to run on the Submittals may be listed by a common monthly date); andthirtieth day after the Effective Date of the Agreement or, ifa Notice to Proceed is given, on the day indicated in the 3. a preliminary schedule of values for all of the WorkNotice to Proceed. A Notice to Proceed may be given at which includes quantities and prices of items which whenany time within 30 days after the Effective Date of the added together equal the Contract Price and subdivides theAgreement. in na ont wlill the Contract Times pcmrenee Work into component parts in sufficient detail to serve asto run later than the sixtieth day afttr the day of Bid opening the basis for progress payments during performance of theor the thirtieth day after the Effcctivo Date of the Work. Such prices will include an appropriate amount ofAgree..e V,.hichever date is earlier. overhead and profit applicable to each item of Work.2.04 Starting the Work C. When executing the Contract Documents,CONTRACTOR shall deliver to the ENGINEERA- CONTRACTOR may start to perform off-site certificates of insurance (and other evidence requested byWork following the effective date of the Agreement, but no OWNER) which CONTRACTOR is required to purchaseWork shall be performed at the Site prior to the date on and maintain in accordance with the requirements ofwhich the Contract Times commence to rnn.A-. Article 5.CONTRA (CTOR shall sta to perform the Work on thedete - hen: the Cantrpet Times e:r ne to ru:n. No Work D. CONTRACTOR shall have prepared-hall be done at the Site pFrior to the date en which the CONTRACTOR's written plan for Project-specific safetyCenct-et TiHes-cemmenee to :u..precautions and proirams in accordance with Paragraph6.13.C. £..d..... o wwfe. .. Befere any Work at the2.05 Before Starting Construction Site io sta.ed. CONTRACTO. R and .. OWNR shall edeliver to thet ther, 'th opirteh additional insuredA. CONTRACTOR's Review of Contract Documents: identified in 4 e Sapplementa y Cndition.s, Pe.tifieatos ofBefore undertaking each part of the Work, imsuranee (and other evidenoe of insuH.race which either OfCONTRACTOR shall carefully study and compare the thern or any additiona insured may reasoably .equest)Contract Documents and check and verify pertinent figures which CONTRACTOR and OWNER reSpe.ti.ely aretherein and all applicable field measurements. "eq i ed to purchase and maintaia in a..ordance .thCONTRACTOR shall promptly report in writing to Article-5.ENGINEER any conflict, error, ambiguity, or discrepancywhich CONTRACTOR may discover and shall obtain a 2.06 Preconstruction Conferencewritten interpretation or clarification from ENGINEERbefore proceeding with any Work affected thereby; A. A Preconstruction Conference shall be held at ahowever, CONTRACTOR shall not be liable to OWNER Time and Place determined by the ENGINEER.A4or ENGINEER for failure to report any conflict, error,Within 20 days after the Con..ract Titoambiguity, or discrepancy in the Contract Documents unless but before any Work at the Site is started, aCONTRACTOR knew or reasonably should have known attended by CONTR.A.CTOR, ENGINEER, and others asthereof appropiate vN4!l be held to establish a werdauinderstanding a ong the pa~ies as to the Work and toB. Preliminary Schedules: Within ten days after the discass the schedules referred to in paragraph 2.05. ,Effectiv.Date f the Ageement.ommencement of Contractpr.edures fer handling Shop Dmrawigs and offieTime (unless otherwise specified in the General submittals, preeouig Applications for Pap .ent' mdRequirements), CONTRACTOR shall submit to ENGI- maintaining required recordsNEER for its timely review:2.07 Initial Acceptance of Schedules1. a preliminary progress schedule indicating the times(numbers of days or dates) for starting and completing theA. Within 10 days after submission of Preliminaryvarious stages of the Work, including any Milestones Schedules required in Paragraph 2.053 ls o.hPr,-sspecified in the Contract Documents;prOy ided in the Contract Documents, at least ten daysbefee submission of the first Application for Payment aconference attended by CONTRACTOR, ENGINEER, andEJCDC No. 1910-8 (1996 Edition) 007200-8w/ JJG Modifications (Rev03/06/08)
others as appropriate will be held to review for acceptability C. Clarifications and interpretations of the Contractto ENGINEER as provided below the schedules submitted Documents shall be issued by ENGINEER as provided inin accordance with paragraph 2.05.B. CONTRACTOR Article 9.shall have an additional ten days to make corrections andadjustments and to complete and resubmit the schedules, D. Each and every provision of law and clauseNo progress payment shall be made to CONTRACTOR required by law to be inserted in these Contractuntil acceptable schedules are submitted to ENGINEER.Documents shall be deemed to be inserted herein, andthey shall be read and enforced as though it were included1. The preliminary progress schedule will be acceptable herein, and if through mistake or otherwise, any suchto ENGINEER if it provides an orderly progression of the provision is not inserted, or if not correctly inserted, thenWork to completion within any specified Milestones and the upon the application of either party, the ContractContract Times. Such acceptance will not impose on Documents shall forthwith be physically amended to makeENGINEER responsibility for the progress schedule, for such insertion.sequencing, scheduling, or progress of the Work norinterfere with or relieve CONTRACTOR from E. Wherever in the Contract Documents the terms "asCONTRACTOR's full responsibility therefor. The ordered", "as directed", "as required". "as allowed", "asprogress schedule may subsequently be adjusted in approved" or terms of like effect or import are used. or theaccordance with paragraph 6.04.adjectives "reasonable", "suitable". "acceptable", "proper"or "satisfactory" or adjectives of like effect or import are2. CONTRACTOR's Submittal Schedule will be used to describe a requirement, direction, review oracceptable to ENGINEER. if it provides, a workable judwrnent of the ENGINEER as to the Work, it is intendedarrangement for reviewing and processing the required that such requirement, direction, review or judgment will &Submittals. The Submittal Schedule may subsequently be solely to evaluate, in general, the completed Work foradjusted in accordance with applicable provisions of the compliance with the requirements of and information in theGeneral Requirements.2. CONTRACTOR's schedule ot Contract Documents and conformance with the designShop Drrni ,g and Sample subni als will be acceptable to concept of the completed Promect as a functioning whole asENGNER if it pr...ides a .... rkbl, ........e.et f shown or indicated in the Contract Documents (uless there....... ,and precessing the required submittal, is a specific statement indicating otherwise). The use of anysuch term or adjective shall not in any way assign to the3. CONTRACTOR's schedule of values will be accept- ENGINEER any duty or authority to supervise or direct theable to ENGINEER as to form and substance if it provides a finishing or performance of Work or any duty or authorityreasonable allocation of the Contract Price to component to undertake responsibility contrary to the provisions ofparts of the Work.paragraph 9.10 or any other provision of the ContractDocuments.ARTICLE 3 - CONTRACT DOCUMENTS: INTENT,AMENDING, REUSE F. "Imperative" or "Command" type language is usedin the Contract Documents. This command language refers3.01 Intent to and is directed to the CONTRACTOR.A. The Contract Documents are complementary; G. Emphasis, such as italics, bold text, underline, orwhat is called for by one is as binding as if called for by all. quotes, has been used throughout the ContractDocuments. Use of emphasis shall not change the meaningof the term emphasized.B. It is the intent of the Contract Documents todescribe a functionally complete Project (or part thereof) toH. No provision of any standard, specification,be constructed in accordance with the Contract Documents. manual, code or any one's instruction shall be effective toAny labor, documentation, services, materials, or equip- change the duties and responsibilities of OWNER.ment that may reasonably be inferred from the Contract CONTRACTOR, ENGINEER, DESIGNER, or any of theDocuments or from prevailing custom or trade usage as subcontractors, consultants, agents or employces frombeing required to produce the intended result will be those set forth in the Contract Documents, nor shall it beprovided whether or not specifically called for at noadditional cost to OWNER.effective to assign to OWNER, ENGINEER or any ofENGINEER's Consultants, DESIGNER or DESIGNER'sConsultants, agents or employees any duty or authority tosupervise or direct the furnishing or performance of theWork or any duty or authority to underptake responsibilityEJCDC No. 1910-8 (1996 Edition) 007200-9w/J3G Modifications (RevO3/06/08)
- Page 1 and 2:
ADDENDUM XDATE: May 19, 2008TO:FROM
- Page 3 and 4:
( 0ORO t'The Unified Government of
- Page 5 and 6:
R: No change to bid date.3- Q: (AG)
- Page 7 and 8:
Part IGeneralSection 01 57 00Enviro
- Page 9 and 10:
005700-3Environmental and Property
- Page 11 and 12:
JORDANJONES &SGOULDINGList of Planh
- Page 13 and 14:
List of Planholders, Athens North O
- Page 15 and 16:
RADDENDUM IXDATE: May 16, 2008TO:FR
- Page 17 and 18:
AGREEMENT BETWEENBUYER AND SELLERFO
- Page 19 and 20:
* Delete page 00520-5 and replace w
- Page 21 and 22:
otherwise.F. Should either party re
- Page 23 and 24:
4gas well as construction of the la
- Page 25 and 26:
QUESTIONS AND RESPONSES NO. 5NORTH
- Page 27 and 28:
Also on drawing 05-CD-1 typical roa
- Page 29 and 30:
R: No change will be made to the do
- Page 31 and 32:
R: Apply protective liner to all in
- Page 33 and 34:
16. Q: (AS)Section 0421.13 - Page 5
- Page 35 and 36:
induction motor data sheet.a) Is th
- Page 37 and 38:
conduit size for P39 to be 1-1/2".
- Page 39 and 40:
R: No change will be made to the do
- Page 41 and 42:
(TC)(TDC)(TDH)(TF)(TI)(TJL)(WGH)(WS
- Page 43 and 44:
(1)Section 00 41 00BidTO:UNIFIED GO
- Page 45 and 46:
004100-3Bidf. Utility Location Allo
- Page 47 and 48:
004100-5BidIte No Decito Qty uni Un
- Page 49 and 50:
0041 00-7BidIte No. Decito t.UiSUi
- Page 51 and 52:
004100-9BidMAJOR PRODUCT OR SYSTEM
- Page 53 and 54:
0041 00-11BidThe Bidder agrees here
- Page 55 and 56:
EQUIPMENT ALLOWANCE SCOPE OF WORKRE
- Page 57 and 58:
March 7, 2008 Amended May 13, 2008T
- Page 59 and 60:
System Controls:Not included in thi
- Page 61 and 62:
* No performance and laboratory tes
- Page 63 and 64:
C. Seller is familiar with and is s
- Page 65 and 66:
Project: Athens, GA North Oconee Ma
- Page 67 and 68:
ARTICLE 4 -BASIS OF PROPOSAL4.01 Pr
- Page 69 and 70:
Weir Specialty PumpsP.O. Box209 (84
- Page 71 and 72:
ATHENS, GA 7 NORTH OCONEE May 12,20
- Page 73 and 74:
Weir Specialty PumpsWEiRco PUMPWEMI
- Page 75 and 76: 1635W. Walnut StreetTU R B LEX Spri
- Page 77 and 78: B. $ 33,658.00 The Seller's monthly
- Page 79 and 80: Quotation # 08RAS-027-01Yancey Powe
- Page 81 and 82: -k 0Quotation # O8RAS-027-01Yancey
- Page 83 and 84: Quotation # OBRAS-027-01Yaney Power
- Page 85 and 86: - Quotation # O8RAS-027-01Yaney pow
- Page 87 and 88: Quotation #- OSRAS-027-01' Yancey25
- Page 89 and 90: Quotation # 08RAS-027-01Yancey Povw
- Page 91 and 92: NPMwerSystms.259 I.eeilndustrW Bilv
- Page 93 and 94: Dubin, GregFrom:Sent:To:Cc:Subject:
- Page 95 and 96: SUPPLEMENTARY CONDITIONS (Rev. 1)Th
- Page 97 and 98: SC 15: Add the followtng paragraph:
- Page 99 and 100: 0 0 0C3) cm C C Ccm 0ES 20 ESw'-a m
- Page 101 and 102: U) SL ct )0 nm 0UCV 0 LC,9 . Q o1 f
- Page 103 and 104: QUESTIONS AND RESPONSES NO. 4NORTH
- Page 105 and 106: would the OCP policy not be enough
- Page 107 and 108: properties used in it methods allow
- Page 109 and 110: 12. Q: (TC) SECTION 31 23 60 - 5 ME
- Page 111 and 112: R: Refer to 05-CU drawings and Spec
- Page 113 and 114: R: See subsequent addenda.Zone 2 84
- Page 115 and 116: actually a refractor 545 or if a re
- Page 117 and 118: ~vRk0 oRADDENDUM IIDATE: April 15,
- Page 119 and 120: STANDARDGENERAL CONDITIONSOF THECON
- Page 121 and 122: GENERAL CONDITIONSARTICLE 1 - DEFIN
- Page 123 and 124: 29. Notice to Proceed--A written no
- Page 125: within the Contract Time, or extend
- Page 129 and 130: 3.04 Amending and Supplementing Con
- Page 131 and 132: a. reviewing and checking all such
- Page 133 and 134: Documents. CONTRACTOR shall also fu
- Page 135 and 136: 5. allow for partial utilization of
- Page 137 and 138: ARTICLE 6 - CONTRACTOR'S RESPONSIBI
- Page 139 and 140: substitte item will perform adequat
- Page 141 and 142: permits and licenses. CONTRACTOR sh
- Page 143 and 144: esponse to such an emergency, a Wor
- Page 145 and 146: 1. is attributable to bodily injury
- Page 147 and 148: 8-05 Lands andEasements; Reports an
- Page 149 and 150: accordance with the provisions of p
- Page 151 and 152: such Claim, dispute, or other matte
- Page 153 and 154: equipment brought to the Project if
- Page 155 and 156: the ENGINEER and the other party to
- Page 157 and 158: incorporation in the Work. Such ins
- Page 159 and 160: ARTICLE 14 - PAYMENTS TO CONTRACTOR
- Page 161 and 162: 2. Should CONTRACTOR neglect to pay
- Page 163 and 164: 14.07 Final Payment ENGINEER will r
- Page 165 and 166: Documents in connection with uncomp
- Page 167 and 168: ADDENDUM VillDATE: May 15, 2008TO:F
- Page 169 and 170: tRkzZRDrawings1. Delete Sheet 05-SE
- Page 171 and 172: Copyright C 2 000National Society o
- Page 173 and 174: AGREEMENT... THIS AGREEMENTi betwee
- Page 175 and 176: 6.04 Seller and Buyer shall execute
- Page 177 and 178:
D. The Contract Documents may only
- Page 179 and 180:
ATTACHMENT ASnecificationsSection T
- Page 181 and 182:
PROPOSAL FORMPRESELECTED EQUIPMENT
- Page 183 and 184:
ARTICLE 4 - BASIS OF PROPOSAL4.01 P
- Page 185 and 186:
PARKSON CORPORATIONUnanimous Writte
- Page 187 and 188:
Hanson, RickFrom:MAHONEY770@aol.com
- Page 189 and 190:
Furt-her,.p ease advise me ifyou wi
- Page 191 and 192:
Copyright 02000National Society of
- Page 193 and 194:
AGREEMENTTHIS AGREEMENT is between(
- Page 195 and 196:
6.04 Seller and Buyer shalt execute
- Page 197 and 198:
ARTICLE 11 - MISCELLANEOUS11.01 Def
- Page 199 and 200:
ATTACHMENT ASpecificationsSection T
- Page 201 and 202:
SIEMENSCOST PROPOSALOdor Control (B
- Page 203 and 204:
SIEMENSTABLE OF CONTENTSNo.Item Des
- Page 205 and 206:
ARTICLE 1- PROPOSAL RECIPIENT1.01 T
- Page 207 and 208:
6,02 The following documents are in
- Page 209 and 210:
SIEMENSSECTION 2SIEMENS' DETAILED S
- Page 211 and 212:
SIEMENSTransfbrmer, Circuit breaker