20.08.2015 Views

Subcontractors

ADDENDUM X

ADDENDUM X

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

others as appropriate will be held to review for acceptability C. Clarifications and interpretations of the Contractto ENGINEER as provided below the schedules submitted Documents shall be issued by ENGINEER as provided inin accordance with paragraph 2.05.B. CONTRACTOR Article 9.shall have an additional ten days to make corrections andadjustments and to complete and resubmit the schedules, D. Each and every provision of law and clauseNo progress payment shall be made to CONTRACTOR required by law to be inserted in these Contractuntil acceptable schedules are submitted to ENGINEER.Documents shall be deemed to be inserted herein, andthey shall be read and enforced as though it were included1. The preliminary progress schedule will be acceptable herein, and if through mistake or otherwise, any suchto ENGINEER if it provides an orderly progression of the provision is not inserted, or if not correctly inserted, thenWork to completion within any specified Milestones and the upon the application of either party, the ContractContract Times. Such acceptance will not impose on Documents shall forthwith be physically amended to makeENGINEER responsibility for the progress schedule, for such insertion.sequencing, scheduling, or progress of the Work norinterfere with or relieve CONTRACTOR from E. Wherever in the Contract Documents the terms "asCONTRACTOR's full responsibility therefor. The ordered", "as directed", "as required". "as allowed", "asprogress schedule may subsequently be adjusted in approved" or terms of like effect or import are used. or theaccordance with paragraph 6.04.adjectives "reasonable", "suitable". "acceptable", "proper"or "satisfactory" or adjectives of like effect or import are2. CONTRACTOR's Submittal Schedule will be used to describe a requirement, direction, review oracceptable to ENGINEER. if it provides, a workable judwrnent of the ENGINEER as to the Work, it is intendedarrangement for reviewing and processing the required that such requirement, direction, review or judgment will &Submittals. The Submittal Schedule may subsequently be solely to evaluate, in general, the completed Work foradjusted in accordance with applicable provisions of the compliance with the requirements of and information in theGeneral Requirements.2. CONTRACTOR's schedule ot Contract Documents and conformance with the designShop Drrni ,g and Sample subni als will be acceptable to concept of the completed Promect as a functioning whole asENGNER if it pr...ides a .... rkbl, ........e.et f shown or indicated in the Contract Documents (uless there....... ,and precessing the required submittal, is a specific statement indicating otherwise). The use of anysuch term or adjective shall not in any way assign to the3. CONTRACTOR's schedule of values will be accept- ENGINEER any duty or authority to supervise or direct theable to ENGINEER as to form and substance if it provides a finishing or performance of Work or any duty or authorityreasonable allocation of the Contract Price to component to undertake responsibility contrary to the provisions ofparts of the Work.paragraph 9.10 or any other provision of the ContractDocuments.ARTICLE 3 - CONTRACT DOCUMENTS: INTENT,AMENDING, REUSE F. "Imperative" or "Command" type language is usedin the Contract Documents. This command language refers3.01 Intent to and is directed to the CONTRACTOR.A. The Contract Documents are complementary; G. Emphasis, such as italics, bold text, underline, orwhat is called for by one is as binding as if called for by all. quotes, has been used throughout the ContractDocuments. Use of emphasis shall not change the meaningof the term emphasized.B. It is the intent of the Contract Documents todescribe a functionally complete Project (or part thereof) toH. No provision of any standard, specification,be constructed in accordance with the Contract Documents. manual, code or any one's instruction shall be effective toAny labor, documentation, services, materials, or equip- change the duties and responsibilities of OWNER.ment that may reasonably be inferred from the Contract CONTRACTOR, ENGINEER, DESIGNER, or any of theDocuments or from prevailing custom or trade usage as subcontractors, consultants, agents or employces frombeing required to produce the intended result will be those set forth in the Contract Documents, nor shall it beprovided whether or not specifically called for at noadditional cost to OWNER.effective to assign to OWNER, ENGINEER or any ofENGINEER's Consultants, DESIGNER or DESIGNER'sConsultants, agents or employees any duty or authority tosupervise or direct the furnishing or performance of theWork or any duty or authority to underptake responsibilityEJCDC No. 1910-8 (1996 Edition) 007200-9w/J3G Modifications (RevO3/06/08)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!