3. ENGINEER's review and approval of Shop Drawings ments and will not be defective. CONTRACTOR'sor Samples shall not relieve CONTRACTOR from warranty and guarantee hereunder excludes defects orresponsibility for any variation from the requirements of the damage caused by:Contract Documents unless CONTRACTOR has in writingcalled ENGINEER's attention to each such variation at the 1. abuse, modification, or improper maintenance ortime of each submittal as required by paragraph 6.17.D.3 operation by persons other than CONTRACTOR, SubandENGINEER has given written approval of each such contractors, Suppliers, or any other individual or entity forvariation by specific written notatien thereof incorporated in whom CONTRACTOR is responsible; ornr ----- the S...p.ra.ing Or SampleappfelField Order; nor will any approval by ENGINEER 2. normal wear and tear under normal usage.relieve CONTRACTOR from responsibility for complyingwith the requirements of paragraph 6.17.D.l. B. CONTRACTOR's obligation to perform andcomplete the Work in accordance with the ContractF. Resubmittal Procedures Documents shall be absolute. None of the following willconstitute an acceptance of Work that is not in accordance1. CONTRACTOR shall make corrections required by with the Contract Documents or a release ofENGINEER and shall return the required number of cor- CONTRACTOR's obligation to perform the Work inrected copies of Shop Drawings and submit as required new accordance with the Contract Documents:Samples for review and approval. CONTRACTOR shalldirect specific attention in writing to revisions other than the 1. observations by ENGINEER;corrections called for by ENGINEER on previoussubmittals. 2. recommendation by ENGINEER or payment byOWNER of any progress or final payment;2. Excessive Shop Drawing Resublnission: ENGINEERwill record time required by ENGINEER or 3. the issuance of a certificate of Substantial CompletionENGINEER'S Consultants or DESIGNER or by ENGINEER or any payment related thereto by OWN-DESIGNER's Consultants for excessive Submittal review ER;occasioned by CONTRACTOR'S resubmission (in excessof two resubmissions of a required Submittal), caused by 4. use or occupancy of the Work or any part thereof byunverified, unchecked or unreviewed, incomplete, OWNER;inaccurate or erroneous, or nonconforming Submittals.Upon receipt of ENGINEER'S accounting of time and 5. any acceptance by OWNER or any failure to do so;costs, CONTRACTOR will reimburse OWNER for thecharges of ENGINEER or ENGINEER'S Consultants 6. any review and approval of a Shop r..ing or Samlereview for excessive resubmission through set-offs from MubmitlSubmittal or the issuance of a notice of acceptabiltherecommended OWNER payments to CONTRACTOR ity by ENGINEER;as established in paragraph 14.02.D.I.C, of theseSupplementary Conditions. 7. any inspection, test, or approval by others; or6.18 Continuing the Work 8. any correction of defective Work by OWNER.A. CONTRACTOR shall carry on the Work and 6.20 Indemnificationadhere to the progress schedule during all disputes ordisagreements with OWNER. No Work shall be delayed or A. To the fullest extent permitted by Laws andpostponed pending resolution of any disputes or Regulations, CONTRACTOR shall indemnify and holddisagreements, except as permitted by paragraph 15.04 or as harmless OWNER, ENGINEER, ENGINEER's Consul-OWNER and CONTRACTOR may otherwise agree in tants, DESIGNER DESIGNER's Consultants and thewriting.officers, directors, partners, employees, agents, and otherconsultants and subcontractors of each and any of them6.19 CONTRACTOR's General Warranty and from and against all claims, costs, losses, and damagesGuarantee(including but not limited to all fees and charges ofengineers, architects, attorneys, and other professionals andA. CONTRACTOR warrants and guarantees to all court or arbitration or other dispute resolution costs)OWNER, ENGINEER, and ENGINEER's Consultants that arising out of or relating to the performance of the Work,all Work will be in accordance with the Contract Docu- provided that any such claim, cost, loss, or damage:EJCDC No. 1910-8 (1996 Edition) 007200-26w/ JJG Modifications (Rev03/06/08)
1. is attributable to bodily injury, sickness, disease, or ARTICLE 7 - OTHER WORKdeath, or to injury to or destruction of tangible property(other than the Work itself), including the loss of use 7.01 Related Work at Siteresulting therefrom; andA. OWNER may perform other work related to the2. is caused in whole or in part by any negligent act or Project at the Site by OWNER's employees, or let otheromission of CONTRACTOR, any Subcontractor, any direct contracts therefor, or have other work performed bySupplier, or any individual or entity directly or indirectly utility owners. If-such other work is not noted in the Conemployedby any of them to perform any of the Work or tract Documents, then:anyone for whose acts any of them may be liable, regardlessof whether or not caused in part by any negligence or 1. written notice thereof will be given to CONTRACTORomission of an individual or entity indemnified hereunder or prior to starting any such other work; andwhether liability is imposed upon such indemnified party byLaws and Regulations regardless of the negligence of any 2. if OWNER and CONTRACTOR are unable to agreesuch individual or entity.on entitlement to or on the amount or extent, if any, of anyadjustment in the Contract Price or Contract Times thatB. In any and all claims against OWNER or ENGI- should be allowed as a result of such other work, a ClaimNEER or any of their respective consultants, agents, may be made therefor as provided in paragraph 10.05.officers, directors, partners, or employees by any employee(or the survivor or personal representative of such B. CONTRACTOR shall afford each other contractoremployee) of CONTRACTOR, any Subcontractor, any who is a party to such a direct contract and each utilitySupplier, or any individual or entity directly or indirectly owner (and OWNER, if OWNER is performing the otheremployed by any of them to perform any of the Work, or work with OWNER's employees) proper and safe access toanyone for whose acts any of them may be liable, the the Site and a reasonable opportunity for the introductionindemnification obligation under paragraph 6.20.A shall not and storage of materials and equipment and the execution ofbe limited in any way by any limitation on the amount or such other work and shall properly coordinate the Worktype of damages, compensation, or benefits payable by or with theirs. Unless otherwise provided in the Contractfor CONTRACTOR or any such Subcontractor, Supplier, Documents, CONTRACTOR shall do all cutting, fitting,or other individual or entity under workers' compensation and patching of the Work that may be required to properlyacts, disability benefit acts, or other employee benefit acts. connect or otherwise make its several parts come togetherand properly integrate with such other work. CON-C. The indemnification obligations of CONTRAC- TRACTOR shall not endanger any work of others byTOR under paragraph 6.20.A shall not extend to the cutting, excavating, or otherwise altering their work and willliability of ENGINEER and ENGINEER's Consultants or only cut or alter their work with the written consent ofDESIGNER or DESIGNER's Consultants to the officers, ENGINEER and the others whose work will be affected.directors, partners, employees, agents, and other consultants The duties and responsibilities of CONTRACTOR underand subcontractors of each and any of them arising out of:this paragraph are for the benefit of such utility owners andother contractors to the extent that there are comparable1. the preparation or approval of, or the failure to prepare provisions for the benefit of CONTRACTOR in said director approve, maps, Drawings, opinions, reports, surveys,Change Orders, designs, or Specifications; orcontracts between OWNER and such utility owners andother contractors.2. giving directions or instructions, or failing to give C. If the proper execution or results of any part ofthem, if that is the primary cause of the injury or damage.CONTRACTOR's Work depends upon work performed byothers under this Article 7, CONTRACTOR shall inspectD. CONTRACTORS, <strong>Subcontractors</strong>, Suppliers and such other work and promptly report to ENGINEER inothers on the Proiect, or their sureties, shall maintain no writing any delays, defects, or deficiencies in such otherdirect action against the ENGINEER or DESIGNER, their work that render it unavailable or unsuitable for the properofficers, employees, affiliated corporations, consultants, execution and results of CONTRACTOR's Work.and <strong>Subcontractors</strong>, for any claim arising out of, in CONTRACTOR's failure to so report will constitute anconnection with, or resultinti from the engineerinu acceptance of such other work as fit and proper forservices performed. Only the OWNER will be the integration with CONTRACTOR's Work except for latentbeneficiary of any undertaking by the ENGINEER.defects and deficiencies in such other work.EJCDC No. 1910-8 (1996 Edition) 007200-27w/ JJG Modifications (Rev03/06/08)
- Page 1 and 2:
ADDENDUM XDATE: May 19, 2008TO:FROM
- Page 3 and 4:
( 0ORO t'The Unified Government of
- Page 5 and 6:
R: No change to bid date.3- Q: (AG)
- Page 7 and 8:
Part IGeneralSection 01 57 00Enviro
- Page 9 and 10:
005700-3Environmental and Property
- Page 11 and 12:
JORDANJONES &SGOULDINGList of Planh
- Page 13 and 14:
List of Planholders, Athens North O
- Page 15 and 16:
RADDENDUM IXDATE: May 16, 2008TO:FR
- Page 17 and 18:
AGREEMENT BETWEENBUYER AND SELLERFO
- Page 19 and 20:
* Delete page 00520-5 and replace w
- Page 21 and 22:
otherwise.F. Should either party re
- Page 23 and 24:
4gas well as construction of the la
- Page 25 and 26:
QUESTIONS AND RESPONSES NO. 5NORTH
- Page 27 and 28:
Also on drawing 05-CD-1 typical roa
- Page 29 and 30:
R: No change will be made to the do
- Page 31 and 32:
R: Apply protective liner to all in
- Page 33 and 34:
16. Q: (AS)Section 0421.13 - Page 5
- Page 35 and 36:
induction motor data sheet.a) Is th
- Page 37 and 38:
conduit size for P39 to be 1-1/2".
- Page 39 and 40:
R: No change will be made to the do
- Page 41 and 42:
(TC)(TDC)(TDH)(TF)(TI)(TJL)(WGH)(WS
- Page 43 and 44:
(1)Section 00 41 00BidTO:UNIFIED GO
- Page 45 and 46:
004100-3Bidf. Utility Location Allo
- Page 47 and 48:
004100-5BidIte No Decito Qty uni Un
- Page 49 and 50:
0041 00-7BidIte No. Decito t.UiSUi
- Page 51 and 52:
004100-9BidMAJOR PRODUCT OR SYSTEM
- Page 53 and 54:
0041 00-11BidThe Bidder agrees here
- Page 55 and 56:
EQUIPMENT ALLOWANCE SCOPE OF WORKRE
- Page 57 and 58:
March 7, 2008 Amended May 13, 2008T
- Page 59 and 60:
System Controls:Not included in thi
- Page 61 and 62:
* No performance and laboratory tes
- Page 63 and 64:
C. Seller is familiar with and is s
- Page 65 and 66:
Project: Athens, GA North Oconee Ma
- Page 67 and 68:
ARTICLE 4 -BASIS OF PROPOSAL4.01 Pr
- Page 69 and 70:
Weir Specialty PumpsP.O. Box209 (84
- Page 71 and 72:
ATHENS, GA 7 NORTH OCONEE May 12,20
- Page 73 and 74:
Weir Specialty PumpsWEiRco PUMPWEMI
- Page 75 and 76:
1635W. Walnut StreetTU R B LEX Spri
- Page 77 and 78:
B. $ 33,658.00 The Seller's monthly
- Page 79 and 80:
Quotation # 08RAS-027-01Yancey Powe
- Page 81 and 82:
-k 0Quotation # O8RAS-027-01Yancey
- Page 83 and 84:
Quotation # OBRAS-027-01Yaney Power
- Page 85 and 86:
- Quotation # O8RAS-027-01Yaney pow
- Page 87 and 88:
Quotation #- OSRAS-027-01' Yancey25
- Page 89 and 90:
Quotation # 08RAS-027-01Yancey Povw
- Page 91 and 92:
NPMwerSystms.259 I.eeilndustrW Bilv
- Page 93 and 94: Dubin, GregFrom:Sent:To:Cc:Subject:
- Page 95 and 96: SUPPLEMENTARY CONDITIONS (Rev. 1)Th
- Page 97 and 98: SC 15: Add the followtng paragraph:
- Page 99 and 100: 0 0 0C3) cm C C Ccm 0ES 20 ESw'-a m
- Page 101 and 102: U) SL ct )0 nm 0UCV 0 LC,9 . Q o1 f
- Page 103 and 104: QUESTIONS AND RESPONSES NO. 4NORTH
- Page 105 and 106: would the OCP policy not be enough
- Page 107 and 108: properties used in it methods allow
- Page 109 and 110: 12. Q: (TC) SECTION 31 23 60 - 5 ME
- Page 111 and 112: R: Refer to 05-CU drawings and Spec
- Page 113 and 114: R: See subsequent addenda.Zone 2 84
- Page 115 and 116: actually a refractor 545 or if a re
- Page 117 and 118: ~vRk0 oRADDENDUM IIDATE: April 15,
- Page 119 and 120: STANDARDGENERAL CONDITIONSOF THECON
- Page 121 and 122: GENERAL CONDITIONSARTICLE 1 - DEFIN
- Page 123 and 124: 29. Notice to Proceed--A written no
- Page 125 and 126: within the Contract Time, or extend
- Page 127 and 128: others as appropriate will be held
- Page 129 and 130: 3.04 Amending and Supplementing Con
- Page 131 and 132: a. reviewing and checking all such
- Page 133 and 134: Documents. CONTRACTOR shall also fu
- Page 135 and 136: 5. allow for partial utilization of
- Page 137 and 138: ARTICLE 6 - CONTRACTOR'S RESPONSIBI
- Page 139 and 140: substitte item will perform adequat
- Page 141 and 142: permits and licenses. CONTRACTOR sh
- Page 143: esponse to such an emergency, a Wor
- Page 147 and 148: 8-05 Lands andEasements; Reports an
- Page 149 and 150: accordance with the provisions of p
- Page 151 and 152: such Claim, dispute, or other matte
- Page 153 and 154: equipment brought to the Project if
- Page 155 and 156: the ENGINEER and the other party to
- Page 157 and 158: incorporation in the Work. Such ins
- Page 159 and 160: ARTICLE 14 - PAYMENTS TO CONTRACTOR
- Page 161 and 162: 2. Should CONTRACTOR neglect to pay
- Page 163 and 164: 14.07 Final Payment ENGINEER will r
- Page 165 and 166: Documents in connection with uncomp
- Page 167 and 168: ADDENDUM VillDATE: May 15, 2008TO:F
- Page 169 and 170: tRkzZRDrawings1. Delete Sheet 05-SE
- Page 171 and 172: Copyright C 2 000National Society o
- Page 173 and 174: AGREEMENT... THIS AGREEMENTi betwee
- Page 175 and 176: 6.04 Seller and Buyer shall execute
- Page 177 and 178: D. The Contract Documents may only
- Page 179 and 180: ATTACHMENT ASnecificationsSection T
- Page 181 and 182: PROPOSAL FORMPRESELECTED EQUIPMENT
- Page 183 and 184: ARTICLE 4 - BASIS OF PROPOSAL4.01 P
- Page 185 and 186: PARKSON CORPORATIONUnanimous Writte
- Page 187 and 188: Hanson, RickFrom:MAHONEY770@aol.com
- Page 189 and 190: Furt-her,.p ease advise me ifyou wi
- Page 191 and 192: Copyright 02000National Society of
- Page 193 and 194: AGREEMENTTHIS AGREEMENT is between(
- Page 195 and 196:
6.04 Seller and Buyer shalt execute
- Page 197 and 198:
ARTICLE 11 - MISCELLANEOUS11.01 Def
- Page 199 and 200:
ATTACHMENT ASpecificationsSection T
- Page 201 and 202:
SIEMENSCOST PROPOSALOdor Control (B
- Page 203 and 204:
SIEMENSTABLE OF CONTENTSNo.Item Des
- Page 205 and 206:
ARTICLE 1- PROPOSAL RECIPIENT1.01 T
- Page 207 and 208:
6,02 The following documents are in
- Page 209 and 210:
SIEMENSSECTION 2SIEMENS' DETAILED S
- Page 211 and 212:
SIEMENSTransfbrmer, Circuit breaker