20.08.2015 Views

Subcontractors

ADDENDUM X

ADDENDUM X

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

value? Machine direction, cross machine direction or both?R: Maximum roll value. Both directions.17. Q: (TC) SECTION 31 32 19.16-6 GEOTEXTILE PART 3.03; JOINTS SUBPARTb.1Please note that a "Minimum" seam strength efficiency of "75 percent" is highlyunlikely when testing is performed in accordance with ASTM D4884. It is morereasonable to expect sixty to sixty-five percent strength retention in seamsmade in a controlled environment such as a fabrication facility or laboratory.Field seam efficiencies normally range from forty to forty-five percent by ASTMD4884. Please research this matter and revise the Specification parametersaccordingly.R: Refer to Addendum No. 7.18. Q: (TC) SECTION 32 11 23- 1-5 AGGREGATE BASE COURSESThe "Aggregate Base Course" section for this Specification omits the use ofgeosynthetics that can be used to improve deformation response of theaggregate base layer, reduce material thickness requirements, improve layerdrainage, reduce undercut and stabilization requirements, increase the servicelife of the roadway, etc. It would be in the best interest of the project Owner toinvestigate the use of geosynthetics in this application to help reduce both initialand long-term roadway costs for their projects.R: Thanks for the information but no changes will be made to the Documents19. Q: (AG) On drawing 05-CS-2 and 4 there is a note calling out a 15' highlandscaped berm yet we cannot find any specifications for landscaping on thisproject, can this please be clarified? Also on drawing 05-CD-1 typical roadsection D it calls out to Bahia sod to be used on "all disturbed areas". It is notclear in the plans and specifications as to where seed is to be used or sod on"all disturbed areas", can this please be clarified? A shaded drawing showingthese differences would be quite helpful.R: See subsequent addenda.20. Q: (TDC) Is there an abbreviation for the type of pipes that are used?1. Finished Water manholes & pipes.Are the pipes ductile Iron?Are the pipes to be booted into the structure?If yes; then the manhole schedule for this size pipe for the FW structuresneeds to be 8 foot min.R: Refer to 05-CU drawings and Specification Section 40 27 00.Pipes are booted into structure.Refer to revised drawing 05-CU-25, part of Addendum No. 7.21. Q: (TDC) Raw Sewage. Are the pipes ductile Iron? Are the pipes to be bootedinto the structure?05/14/08 02001-158A OR 4-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!