comply with the above experience requirements, then the manufacturer shallsubmit with the shop drawings, a maintenance bond executed by an Officer ofthe Corporation in the amount of 150% of the bid price guaranteeing repair orreplacement of the air diffusion system in the event of a failure for a period ofthree years after the specified warranty. During such three year period themanufacturer shall repair, modify or replace the air diffusers in a manneracceptable to the Owner, if the operation of the air diffusers is unsatisfactory.Normal wear or malfunctions due to neglect or abuse will not be consideredjustifiable reasons for unsatisfactory operation. In the event the Ownerdetermines the operation of the air diffusers to be unsatisfactory during thisthree year period and the manufacturer fails to correct the deficiencies withinsix months from the time the manufacturer is first notified in writing that suchdeficiencies exist, the Owner will, as its sole option, make the necessary repairsor replacement and deduct costs from the aforementioned bond of themanufacturer.R: See subsequent addenda.33. Q: (SA) Section 44 45 16.02 - Page 6 (1.07A) - We recommend specifying theminimum quantity of Spare Parts. Our recommendations are below:ItemCompletely Assembled DiffusersQuantity10Air distribution pipe support assemblies 10Air distribution pipe joints 10Tool sets, if required, from removal and 3replacement of diffuser assembliesR: See subsequent addenda.34. Q: (SA) Section 44 45 16.02-. Page 8 - 2.06 A - We recommend deleting thelast sentence and replacing with the following:"Supports shall be fabricated from minimum Y2" rod and shall be mounted to thefloor with a single anchor bolt."R: See subsequent addenda.35. Q: (SEP) Could you please confirm if the project requires HOISTS? If so howmany?R: See drawings for project requirements.36. Q: (SEP) Also, the panel specs seem to require 24 identical control panels but forsome reason the "TAG NUMBERS" are split between two rows on the datatable on page 4 of 432256.01 of the mixer spec; can you clarify?R: 14 panels are required. The panels listed on the first row are for a single mixer.The panels listed on the second row are for two mixers.37. Q: (HL) Type 23 calls out Petrolux. I will assume this to be our PTA wet listed unitand that there is no need for hazardous unit. The description call for "reflector'and then enclosed borosilicate glass optic". I need to know if what is needed is05/14/08 02001-158A QR 4-12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!