thereon of any such Resident Project Representative andassistants will be as provided in paragraph 9.10 and in theSupplementary Conditions. If OWNER designates anotherrepresentative or agent to represent OWNER at the Site paragraph 10.05.who is not ENGINEER's Consultant, agent or employee,the responsibilities and authority and limitations thereon of 9.06 Rejecting Defective Worksuch other individual or entity will be as provided in theSupplementary Conditions.or extent, if any, of any adjustment in the Contract Price orContract Times, or both, as a result of -a Field Order, aClaim may be made dwe-therefore as provided inA. ENGINEER will have authority to disapprove orreject Work which ENGINEER believes to be defective, orB. The Resident Project Representatives will be that ENGINEER believes will not produce a completedauthorized to observe all Work done and all products Project that conforms to the Contract Documents or thatfurnished, including preparation, fabrication and will prejudice the integrity of the design concept of themanufacture of the products to be used, but the Resident completed Project as a functioning whole as indicated byProject Representatives will not be authorized to alter or the Contract Documents. ENGINEER will also havewaive any requirements of the Contract Documents. The authority to require special inspection or testing of the WorkResident Project Representatives may reiect products or as provided in paragraph 13.04, whether or not the Work issuspend the Work until any queslion at issue can be fabricated, installed, or completed.referred to and decided by the ENGINEER.R-,ENGINEER Ai1! furmih a Resident Prjct 907 Shop Drawings, Change Orders and PaymentsRepesetatveand assistants to assist ENGINEER inobserilg the pe.rffmane Of the. Wor.F The duties and A. In connection with ENGINEER's authority as torespsnsibilities of the Resident Preject Representative will Shop Drawings and Samples, see paragraph 6.17.be as enu-meraited in a doeureent enild"Duties,Responsibilities and Limitations of the Autherity of B. In connection with ENGINEER's authority as toResident Project Representative" as ataphpd tH the end of Change Orders, see Articles 10, 11, and 12.C. In connection with ENGINEER's authority as to9.04 Clarifications and Interpretations Applications for Payment, see Article 14.A. ENGINEER will issue with reasonable promptness 9.08 Determt mationsfor Unit Price Worksuch written clarifications or interpretations of the requirementsof the Contract Documents as ENGINEER mayA. ENGINEER will deternine the actual quantitiesdetermine necessary, which shall be consistent with the and classifications of Unit Price Work performed byintent of and reasonably inferable from the Contract Docu- CONTRACTOR. ENGINEER will review with CONments.Such written clarifications and interpretations will TRACTOR the ENGINEER's preliminary determinationsbe binding on OWNER and CONTRACTOR. If OWNER on such matters before rendering a written decision thereonand CONTRACTOR are unable to agree on entitlement to (by recommendation of an Application for Payment oror on the amount or extent, if any, of any adjustment in the otherwise). ENGINEER's written decision thereon will beContract Price or Contract Times, or both, that should be final and binding (except as modified by ENGINEER toallowed as a result of a written clarification or interpre- reflect changed factual conditions or more accurate data)tation, a Claim may be made tiire4Ptthcrefore as provided upon OWNER and CONTRACTOR, subject to thein paragraph 10.05. provisions of paragraph 10.05.9.05 Authorized Variations in Work 9.09 Decisions on Requirements oJ ContractDocuments and Acceptability of WorkA. ENGINEER may authorize minor variations in theWork from the requirements of the Contract DocumentsA. ENGINEER will be the initial interpreter of thewhich do not involve an adjustment in the Contract Price or requirements of the Contract Documents and judge of thethe Contract Times and are compatible with the design acceptability of the Work thereunder. Claims, disputes andconcept of the completed Project as a functioning whole as other matters relating to the acceptability of the Work, theindicated by the Contract Documents. These may be quantities and classifications of Unit Price Work, theaccomplished by a Field Order and will be binding on interpretation of the requirements of the ContractOWNER and also on CONTRACTOR, who shall perform Documents pertaining to the performance of the Work, andthe Work involved promptly. If OWNER and CONTRAC- Claims seeking changes in the Contract Price or ContractTOR are unable to agree on entitlement to or on the amount Times will be referred initially to ENGINEER in writing, inEICDC No. 1910-8 (1996 Edition) 007200-30w/ JJG Modifications (Rev03/06/08)
accordance with the provisions of paragraph 10.05, with arequest for a formal decision.results certified indicate compliance with, the ContractDocuments.B. When functioning as interpreter and judge under E. The limitations upon authority and responsibilitythis paragraph 9.09, ENGINEER wil not show partiality to set forth in this paragraph 9.10 shall also apply toOWNER or CONTRACTOR and will not be liable in ENGINEER's Consultants, Resident Project Repreconnectionwith any interpretation or decision rendered in sentative, and assistants.good faith in such capacity. The rendering of a decision byENGINEER pursuant to this paragraph 9.09 with respect to ARTICLE 10 - CHANGES IN THE WORK: CLAIMSany such Claim, dispute, or other matter (except any whichhave been waived by the making or acceptance of final 10.01 Authorized Changes in the Workpayment as provided in paragraph 14.07) will be a conditionprecedent to any exercise by OWNER or CONTRACTOR A. Without invalidating the Agreement and withoutof such rights or remedies as either may otherwise have notice to any surety, OWNER may, at any time or from timeunder the Contract Documents or by Laws or Regulations in to time, order additions, deletions, or revisions in the Workrespect of any such Claim, dispute, or other matter.by a Written Amendment, a Change Order, or a WorkChange Directive. Upon receipt of any such document,9.10 Limitations on ENGINEER's Authority and CONTRACTOR shall promptly proceed with the WorkResponsibilitiesinvolved which will be performed under the applicableconditions of the Contract Documents (except as otherwiseA. Neither ENGINEER's authority or responsibility specifically provided).under this Article 9 or under any other provision of theContract Documents nor any decision made by ENGINEER 1. OWNER may, in anticipation of possibly ordering anin good faith either to exercise or not exercise such addition, deletion or revision to the Work, requestauthority or responsibility or the undertaking, exercise, or CONTRACTOR to prepare a proposal of cost and times toperformance of any authority or responsibility by perform OWNER's contemplated changes in the Work.ENGINEER shall create, impose, or give rise to any duty in CONTRACTOR's written proposal shall be transmitted tocontract, tort, or otherwise owed by ENGINEER to the ENGINEER promptly, but not later than fourteen daysCONTRACTOR, any Subcontractor, any Supplier, any after CONTRACTOR's receipt of OWNER's writtenother individual or entity, or to any surety for or employee request and shall remain a firm offer for a period not lessor agent of any of them.than fourtv-five days after receipt by ENGINEER.B. ENGINEER will not supervise, direct, control, or 2. CONTRACTOR is not authorized to proceed on anhave authority over or be responsible for CONTRACTOR's OWNER contemplated change in the Work prior tomeans, methods, techniques, sequences, or procedures of CONTRACTOR's receipt of a Chance Order (or Workconstruction, or the safety precautions and programs Change Directive) incomorating such chance into theincident thereto, or for any failure of CONTRACTOR to Work.comply with Laws and Regulations applicable to the performanceof the Work. ENGINEER will not be responsible 3. OWNER's request for proposal or CONTRACTOR'sfor CONTRACTOR's failure to perform the Work in accor- failure to submit such proposal within the required timedance with the Contract Documents.period will not justify a claim for an adjustment inContract Price or Contract Time for Milestones).C. ENGINEER will not be responsible for the acts oromissions of CONTRACTOR or of any Subcontractor, any 4. The OWNER shall not be liable to theSupplier, or of any other individual or entity performing CONTRACTOR for any costs associated with theany of the Work. preparation of proposal associated with OWNER'Scontemplated changes in the Work.D. ENGINEER's review of the final Application forPayment and accompanying documentation and all mainte- B. If OWNER and CONTRACTOR are unable tonance and operating instructions, schedules, guarantees, agree on entitlement to, or on the amount or extent, if any,Bonds, certificates of inspection, tests and approvals, and of an adjustment in the Contract Price or Contract Times, orother documentation required to be delivered by paragraph both, that should be allowed as a result of a Work Change14.07.A will only be to determine generally that their Directive, a Claim may be made therefor as provided incontent complies with the requirements of, and in the case paragraph 10.05.of certificates of inspections, tests, and approvals that theEJCDC No. 1910-8 (1996 Edition) 007200-31w/ JJG Modifications (Rev03/06/08)
- Page 1 and 2:
ADDENDUM XDATE: May 19, 2008TO:FROM
- Page 3 and 4:
( 0ORO t'The Unified Government of
- Page 5 and 6:
R: No change to bid date.3- Q: (AG)
- Page 7 and 8:
Part IGeneralSection 01 57 00Enviro
- Page 9 and 10:
005700-3Environmental and Property
- Page 11 and 12:
JORDANJONES &SGOULDINGList of Planh
- Page 13 and 14:
List of Planholders, Athens North O
- Page 15 and 16:
RADDENDUM IXDATE: May 16, 2008TO:FR
- Page 17 and 18:
AGREEMENT BETWEENBUYER AND SELLERFO
- Page 19 and 20:
* Delete page 00520-5 and replace w
- Page 21 and 22:
otherwise.F. Should either party re
- Page 23 and 24:
4gas well as construction of the la
- Page 25 and 26:
QUESTIONS AND RESPONSES NO. 5NORTH
- Page 27 and 28:
Also on drawing 05-CD-1 typical roa
- Page 29 and 30:
R: No change will be made to the do
- Page 31 and 32:
R: Apply protective liner to all in
- Page 33 and 34:
16. Q: (AS)Section 0421.13 - Page 5
- Page 35 and 36:
induction motor data sheet.a) Is th
- Page 37 and 38:
conduit size for P39 to be 1-1/2".
- Page 39 and 40:
R: No change will be made to the do
- Page 41 and 42:
(TC)(TDC)(TDH)(TF)(TI)(TJL)(WGH)(WS
- Page 43 and 44:
(1)Section 00 41 00BidTO:UNIFIED GO
- Page 45 and 46:
004100-3Bidf. Utility Location Allo
- Page 47 and 48:
004100-5BidIte No Decito Qty uni Un
- Page 49 and 50:
0041 00-7BidIte No. Decito t.UiSUi
- Page 51 and 52:
004100-9BidMAJOR PRODUCT OR SYSTEM
- Page 53 and 54:
0041 00-11BidThe Bidder agrees here
- Page 55 and 56:
EQUIPMENT ALLOWANCE SCOPE OF WORKRE
- Page 57 and 58:
March 7, 2008 Amended May 13, 2008T
- Page 59 and 60:
System Controls:Not included in thi
- Page 61 and 62:
* No performance and laboratory tes
- Page 63 and 64:
C. Seller is familiar with and is s
- Page 65 and 66:
Project: Athens, GA North Oconee Ma
- Page 67 and 68:
ARTICLE 4 -BASIS OF PROPOSAL4.01 Pr
- Page 69 and 70:
Weir Specialty PumpsP.O. Box209 (84
- Page 71 and 72:
ATHENS, GA 7 NORTH OCONEE May 12,20
- Page 73 and 74:
Weir Specialty PumpsWEiRco PUMPWEMI
- Page 75 and 76:
1635W. Walnut StreetTU R B LEX Spri
- Page 77 and 78:
B. $ 33,658.00 The Seller's monthly
- Page 79 and 80:
Quotation # 08RAS-027-01Yancey Powe
- Page 81 and 82:
-k 0Quotation # O8RAS-027-01Yancey
- Page 83 and 84:
Quotation # OBRAS-027-01Yaney Power
- Page 85 and 86:
- Quotation # O8RAS-027-01Yaney pow
- Page 87 and 88:
Quotation #- OSRAS-027-01' Yancey25
- Page 89 and 90:
Quotation # 08RAS-027-01Yancey Povw
- Page 91 and 92:
NPMwerSystms.259 I.eeilndustrW Bilv
- Page 93 and 94:
Dubin, GregFrom:Sent:To:Cc:Subject:
- Page 95 and 96:
SUPPLEMENTARY CONDITIONS (Rev. 1)Th
- Page 97 and 98: SC 15: Add the followtng paragraph:
- Page 99 and 100: 0 0 0C3) cm C C Ccm 0ES 20 ESw'-a m
- Page 101 and 102: U) SL ct )0 nm 0UCV 0 LC,9 . Q o1 f
- Page 103 and 104: QUESTIONS AND RESPONSES NO. 4NORTH
- Page 105 and 106: would the OCP policy not be enough
- Page 107 and 108: properties used in it methods allow
- Page 109 and 110: 12. Q: (TC) SECTION 31 23 60 - 5 ME
- Page 111 and 112: R: Refer to 05-CU drawings and Spec
- Page 113 and 114: R: See subsequent addenda.Zone 2 84
- Page 115 and 116: actually a refractor 545 or if a re
- Page 117 and 118: ~vRk0 oRADDENDUM IIDATE: April 15,
- Page 119 and 120: STANDARDGENERAL CONDITIONSOF THECON
- Page 121 and 122: GENERAL CONDITIONSARTICLE 1 - DEFIN
- Page 123 and 124: 29. Notice to Proceed--A written no
- Page 125 and 126: within the Contract Time, or extend
- Page 127 and 128: others as appropriate will be held
- Page 129 and 130: 3.04 Amending and Supplementing Con
- Page 131 and 132: a. reviewing and checking all such
- Page 133 and 134: Documents. CONTRACTOR shall also fu
- Page 135 and 136: 5. allow for partial utilization of
- Page 137 and 138: ARTICLE 6 - CONTRACTOR'S RESPONSIBI
- Page 139 and 140: substitte item will perform adequat
- Page 141 and 142: permits and licenses. CONTRACTOR sh
- Page 143 and 144: esponse to such an emergency, a Wor
- Page 145 and 146: 1. is attributable to bodily injury
- Page 147: 8-05 Lands andEasements; Reports an
- Page 151 and 152: such Claim, dispute, or other matte
- Page 153 and 154: equipment brought to the Project if
- Page 155 and 156: the ENGINEER and the other party to
- Page 157 and 158: incorporation in the Work. Such ins
- Page 159 and 160: ARTICLE 14 - PAYMENTS TO CONTRACTOR
- Page 161 and 162: 2. Should CONTRACTOR neglect to pay
- Page 163 and 164: 14.07 Final Payment ENGINEER will r
- Page 165 and 166: Documents in connection with uncomp
- Page 167 and 168: ADDENDUM VillDATE: May 15, 2008TO:F
- Page 169 and 170: tRkzZRDrawings1. Delete Sheet 05-SE
- Page 171 and 172: Copyright C 2 000National Society o
- Page 173 and 174: AGREEMENT... THIS AGREEMENTi betwee
- Page 175 and 176: 6.04 Seller and Buyer shall execute
- Page 177 and 178: D. The Contract Documents may only
- Page 179 and 180: ATTACHMENT ASnecificationsSection T
- Page 181 and 182: PROPOSAL FORMPRESELECTED EQUIPMENT
- Page 183 and 184: ARTICLE 4 - BASIS OF PROPOSAL4.01 P
- Page 185 and 186: PARKSON CORPORATIONUnanimous Writte
- Page 187 and 188: Hanson, RickFrom:MAHONEY770@aol.com
- Page 189 and 190: Furt-her,.p ease advise me ifyou wi
- Page 191 and 192: Copyright 02000National Society of
- Page 193 and 194: AGREEMENTTHIS AGREEMENT is between(
- Page 195 and 196: 6.04 Seller and Buyer shalt execute
- Page 197 and 198: ARTICLE 11 - MISCELLANEOUS11.01 Def
- Page 199 and 200:
ATTACHMENT ASpecificationsSection T
- Page 201 and 202:
SIEMENSCOST PROPOSALOdor Control (B
- Page 203 and 204:
SIEMENSTABLE OF CONTENTSNo.Item Des
- Page 205 and 206:
ARTICLE 1- PROPOSAL RECIPIENT1.01 T
- Page 207 and 208:
6,02 The following documents are in
- Page 209 and 210:
SIEMENSSECTION 2SIEMENS' DETAILED S
- Page 211 and 212:
SIEMENSTransfbrmer, Circuit breaker