20.08.2015 Views

Subcontractors

ADDENDUM X

ADDENDUM X

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

~vRk0 oRADDENDUM IIDATE: April 15, 2008TO:FROM:RE:ALL PROSPECTIVE BIDDERSJulie Ann Donahue, CPPBPurchasing AdministratorAddendum II, Bid # 00280, Athens North Oconee Water Reclamation FacilityThe following revisions are made to the Plans and Specifications of BID #00280, Athens NorthOconee Water Reclamation Facility:Specifications1. Page 00 41 00-2, delete Items 3.a. and 3.b. Renumber subsequent items.2. Delete Section 00 72 00 General Conditions and replace with 00 72 00 General Conditionsincluded in this addendum(No content change, however, track changes version beingissued herein.)3. Page 01 29 00-7, Article 1.08, delete Paragraph B in its entirety and replace with thefollowing,"B.Mass Rock Excavation:1. No separate payment will be made for mass rock excavation.2. Payment for blasting monitoring shall be made from the "BlastingMonitoring" Cash Allowance. A fee must be agreed upon by the Engineerprior to the Contractor employing an independent, qualified specialtysubcontractor to monitor the blasting. If the Contractor employs thespecialty subcontractor prior to the Engineer's approval of the fee, all suchcosts are subject to non-reimbursement."4. Page 01 29 00-8, Article 1.08, delete Paragraph D in its entirety and replace with thefollowing,"D. Trench Rock Excavation:I. No separate payment will be made for trench rock excavation.2. Payment for blasting monitoring shall be made from the "Blasting#00280 Addendum 2 BID.doc Page 1 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!