3. any CONTRACTOR interpretation of or conclusion b. with respect to Work that is paid for on a Unit Pricedrawn from any "technical data" or any such other data, Basis, any adjustment in Contract Price will be subject tointerpretations, opinions, or information, the provisions of paragraphs 9.08 and 11.03.4.03 Differing Subsurface or Physical Conditions 2. CONTRACTOR shall not be entitled to any adjustmentin the Contract Price or Contract Times if:A. Notice: If CONTRACTOR believes that anysubsurface or physical condition at or contiguous to the Site a. CONTRACTOR knew of the existence of suchthat is uncovered or revealed either:conditions at the time CONTRACTOR made a finalcommitment to OWNER in respect of Contract Price and1. is of such a nature as to establish that any "technical Contract Times by the submission of a Bid or becomingdata" on which CONTRACTOR is entitled to rely as bound under a negotiated contract; orprovided in paragraph 4.02 is materially inaccurate; orb. the existence of such condition could reasonably have2. is of such a nature as to require a change in the been discovered or revealed as a result of any examination,Contract Documents; orinvestigation, exploration, test, or study of the Site andcontiguous areas required by the Bidding Requirements or3. differs materially from that shown or indicated in the Contract Documents to be conducted by or for CON-Contract Documents; orTRACTOR prior to CONTRACTOR's making such finalcommitment; or4. is of an unusual nature, and differs materially fromconditions ordinarily encountered and genetally recogmized c. CONTRACTOR failed to give the written noticeas inherent in work of the character provided for in the within the time and as required by paragraph 4.03.A.Contract Documents;3. If OWNER and CONTRACTOR are unable to agreethen CONTRACTOR shall, promptly after becoming aware on entitlement to or on the amount or extent if any, of anythereof and before further disturbing the subsurface or adjustment in the Contract Price or Contract Times, or both,physical conditions or performing any Work in connection a Claim may be made therefor as provided in paragraphtherewith (except in an emergency as required by paragraph 10.05. However, OWNER, ENGINEER, and6.16.A), notify OWNER and ENGINEER in writing about ENGINEER's Consultants shall not be liable tosuch condition. CONTRACTOR shall not further disturb CONTRACTOR for any claims, costs, losses, or damagessuch condition or perform any Work in connection (including but not limited to all fees and charges oftherewith (except as aforesaid) until receipt of written order engineers, architects, attorneys, and other professionals andto do so.all court or arbitration or other dispute resolution costs)sustained by CONTRACTOR on or in connection with anyB. ENGINEER's Review: After receipt of written other project or anticipated project.notice as required by paragraph 4.03,A, ENGINEER willpromptly review the pertinent condition, determine the 4.04 Underground Facilitiesnecessity of OWNER's obtaining additional exploration ortests with respect thereto, and advise OWNER in writingA. Shown or Indicated: The information and data(with a copy to CONTRACTOR) of ENGINEER's findings shown or indicated in the Contract Documents with respectand conclusions,to existing Underground Facilities at or contiguous to theSite is based on information and data furnished to OWNERC. Possible Price and Times Adjustments or ENGINEER by the owners of such Underground Facilities,including OWNER, or by others, Unless it is otherwiseI. The Contract Price or the Contract Times, or both, will expressly provided in the Supplementary Conditions:be equitably adjusted to the extent that the existence of suchdiffering subsurface or physical condition causes an in- 1. OWNER and ENGINEER shall not be responsible forcrease or decrease in CONTRACTOR's cost of, or time the accuracy or completeness of any such information orrequired for, performance of the Work; subject, however, to data; andthe following:2, the cost of all of the following will be included in thea. such condition must meet any one or more of the Contract Price, and CONTRACTOR shall have fullcategories described in paragraph 4.03.A; andresponsibility for:EJCDC No. 1910-8 (1996 Edition) 007200- 12w/ JJG Modifications (Rev03/06/08)
a. reviewing and checking all such information and data, and preserve the established reference points and propertymonuments, and shall make no changes or relocationsb. locating all Underground Facilities shown or indicated without the prior written approval of OWNER.in the Contract Documents,CONTRACTOR shall report to ENGINEER whenever anyreference point or property monument is lost or destroyed orc. coordination of the Work with the owners of such Un- requires relocation because of necessary changes in gradesderground Facilities, including OWNER, during construction,andor locations, and shall be responsible for the accuratereplacement or relocation of such reference points orproperty monuments by professionally qualified personnel.d. the safety and protection of all such UndergroundFacilities and repairing any damage thereto resulting from B. ENGINEER may check the lines, elevations,the Work. reference marks, batter boards, etc.. set byCONTRACTOR, and CONTRACTOR shall correct anyB. Not Shown or Indicated errors disclosed by such check. Such a check shall not beconsidered as approval of CONTRACTOR's work and1. If an Underground Facility is uncovered or revealed at shall not relieve CONTRACTOR of the responsibility foror contiguous to the Site which was not shown or indicated, accurate construction of the entire Work.or not shown or indicated with reasonable accuracy in the CONTRACTOR shall furnish personnel to assistContract Documents, CONTRACTOR shall, promptly after ENCiINEER in checkinz lines and 2rades.becoming aware thereof and before further disturbingconditions affected thereby or performing any Work in 4.06 Hazardous Environmental Condition at Siteconnection therewith (except in an emergency as requiredby paragraph 6.16.A), identify the owner of such Under- A. Reports and Drawings. Reference is made to theground Facility and give written notice to that owner and to Supplementary Conditions for the identification of thoseOWNER and ENGINEER. ENGINEER will promptly reports and drawings relating to a Hazardous Environmentalreview the Underground Facility and determine the extent, Condition identified at the Site, if any, that have beenif any, to which a change is required in the Contract utilized by the ENGINEER in the preparation of theDocuments to reflect and document the consequences of the Contract Documents.existence or location of the Underground Facility. Duringsuch time, CONTRACTOR shall be responsible for theB. Limited Reliance by CONTRACTOR on Technicalsafety and protection of such Underground Facility.Data Authorized- CONTRACTOR may rely upon thegeneral accuracy of the "technical data" contained in such2. If ENGINEER concludes that a change in the Contract reports and drawings, but such reports and drawings are notDocuments is required, a Work Change Directive or a Contract Documents. Such "technical data" is identified inChange Order will be issued to reflect and document such the Supplementary Conditions. Except for such reliance onconsequences. An equitable adjustment shall be made in such "technical data," CONTRACTOR may not rely uponthe Contract Price of Contract Times, or both, to the extent or make any Claim against OWNER, ENGINEER or any ofthat they are attributable to the existence or location of any ENGINEER's Consultants with respect to:Underground Facility that was not shown or indicated or notshown or indicated with reasonable accuracy in the Contract 1. the completeness of such reports and drawings forDocuments and that CONTRACTOR did not know of and CONTRACTOR's purposes, including, but not limited to,could not reasonably have been expected to be aware of or any aspects of the means, methods, techniques, sequencesto have anticipated. If OWNER and CONTRACTOR are and procedures of construction to be employed byunable to agree on entitlement to or on the amount or extent, CONTRACTOR and safety precautions and programsif any, of any such adjustment in Contract Price or Contract incident thereto; orTimes, OWNER or CONTRACTOR may make a Claimtherefor as provided in paragraph 10.05, 2. other data, interpretations, opinions and informationcontained in such reports or shown or indicated in such4.05 Reference Points drawings; orA. OWNER shall provide engineering surveys to 3. any CONTRACTOR interpretation of or conclusionestablish reference points for construction which in drawn from any "technical data" or any such other data,ENGINEER's judgment are necessary to enable CON- interpretations, opinions or information.TRACTOR to proceed with the Work. CONTRACTORshall be responsible for laying out the Work, shall protectEJCDC No. 1910-8 (1996 Edition) 007200- 13w/ JJG Modifications (RevO3/06/08)
- Page 1 and 2:
ADDENDUM XDATE: May 19, 2008TO:FROM
- Page 3 and 4:
( 0ORO t'The Unified Government of
- Page 5 and 6:
R: No change to bid date.3- Q: (AG)
- Page 7 and 8:
Part IGeneralSection 01 57 00Enviro
- Page 9 and 10:
005700-3Environmental and Property
- Page 11 and 12:
JORDANJONES &SGOULDINGList of Planh
- Page 13 and 14:
List of Planholders, Athens North O
- Page 15 and 16:
RADDENDUM IXDATE: May 16, 2008TO:FR
- Page 17 and 18:
AGREEMENT BETWEENBUYER AND SELLERFO
- Page 19 and 20:
* Delete page 00520-5 and replace w
- Page 21 and 22:
otherwise.F. Should either party re
- Page 23 and 24:
4gas well as construction of the la
- Page 25 and 26:
QUESTIONS AND RESPONSES NO. 5NORTH
- Page 27 and 28:
Also on drawing 05-CD-1 typical roa
- Page 29 and 30:
R: No change will be made to the do
- Page 31 and 32:
R: Apply protective liner to all in
- Page 33 and 34:
16. Q: (AS)Section 0421.13 - Page 5
- Page 35 and 36:
induction motor data sheet.a) Is th
- Page 37 and 38:
conduit size for P39 to be 1-1/2".
- Page 39 and 40:
R: No change will be made to the do
- Page 41 and 42:
(TC)(TDC)(TDH)(TF)(TI)(TJL)(WGH)(WS
- Page 43 and 44:
(1)Section 00 41 00BidTO:UNIFIED GO
- Page 45 and 46:
004100-3Bidf. Utility Location Allo
- Page 47 and 48:
004100-5BidIte No Decito Qty uni Un
- Page 49 and 50:
0041 00-7BidIte No. Decito t.UiSUi
- Page 51 and 52:
004100-9BidMAJOR PRODUCT OR SYSTEM
- Page 53 and 54:
0041 00-11BidThe Bidder agrees here
- Page 55 and 56:
EQUIPMENT ALLOWANCE SCOPE OF WORKRE
- Page 57 and 58:
March 7, 2008 Amended May 13, 2008T
- Page 59 and 60:
System Controls:Not included in thi
- Page 61 and 62:
* No performance and laboratory tes
- Page 63 and 64:
C. Seller is familiar with and is s
- Page 65 and 66:
Project: Athens, GA North Oconee Ma
- Page 67 and 68:
ARTICLE 4 -BASIS OF PROPOSAL4.01 Pr
- Page 69 and 70:
Weir Specialty PumpsP.O. Box209 (84
- Page 71 and 72:
ATHENS, GA 7 NORTH OCONEE May 12,20
- Page 73 and 74:
Weir Specialty PumpsWEiRco PUMPWEMI
- Page 75 and 76:
1635W. Walnut StreetTU R B LEX Spri
- Page 77 and 78:
B. $ 33,658.00 The Seller's monthly
- Page 79 and 80: Quotation # 08RAS-027-01Yancey Powe
- Page 81 and 82: -k 0Quotation # O8RAS-027-01Yancey
- Page 83 and 84: Quotation # OBRAS-027-01Yaney Power
- Page 85 and 86: - Quotation # O8RAS-027-01Yaney pow
- Page 87 and 88: Quotation #- OSRAS-027-01' Yancey25
- Page 89 and 90: Quotation # 08RAS-027-01Yancey Povw
- Page 91 and 92: NPMwerSystms.259 I.eeilndustrW Bilv
- Page 93 and 94: Dubin, GregFrom:Sent:To:Cc:Subject:
- Page 95 and 96: SUPPLEMENTARY CONDITIONS (Rev. 1)Th
- Page 97 and 98: SC 15: Add the followtng paragraph:
- Page 99 and 100: 0 0 0C3) cm C C Ccm 0ES 20 ESw'-a m
- Page 101 and 102: U) SL ct )0 nm 0UCV 0 LC,9 . Q o1 f
- Page 103 and 104: QUESTIONS AND RESPONSES NO. 4NORTH
- Page 105 and 106: would the OCP policy not be enough
- Page 107 and 108: properties used in it methods allow
- Page 109 and 110: 12. Q: (TC) SECTION 31 23 60 - 5 ME
- Page 111 and 112: R: Refer to 05-CU drawings and Spec
- Page 113 and 114: R: See subsequent addenda.Zone 2 84
- Page 115 and 116: actually a refractor 545 or if a re
- Page 117 and 118: ~vRk0 oRADDENDUM IIDATE: April 15,
- Page 119 and 120: STANDARDGENERAL CONDITIONSOF THECON
- Page 121 and 122: GENERAL CONDITIONSARTICLE 1 - DEFIN
- Page 123 and 124: 29. Notice to Proceed--A written no
- Page 125 and 126: within the Contract Time, or extend
- Page 127 and 128: others as appropriate will be held
- Page 129: 3.04 Amending and Supplementing Con
- Page 133 and 134: Documents. CONTRACTOR shall also fu
- Page 135 and 136: 5. allow for partial utilization of
- Page 137 and 138: ARTICLE 6 - CONTRACTOR'S RESPONSIBI
- Page 139 and 140: substitte item will perform adequat
- Page 141 and 142: permits and licenses. CONTRACTOR sh
- Page 143 and 144: esponse to such an emergency, a Wor
- Page 145 and 146: 1. is attributable to bodily injury
- Page 147 and 148: 8-05 Lands andEasements; Reports an
- Page 149 and 150: accordance with the provisions of p
- Page 151 and 152: such Claim, dispute, or other matte
- Page 153 and 154: equipment brought to the Project if
- Page 155 and 156: the ENGINEER and the other party to
- Page 157 and 158: incorporation in the Work. Such ins
- Page 159 and 160: ARTICLE 14 - PAYMENTS TO CONTRACTOR
- Page 161 and 162: 2. Should CONTRACTOR neglect to pay
- Page 163 and 164: 14.07 Final Payment ENGINEER will r
- Page 165 and 166: Documents in connection with uncomp
- Page 167 and 168: ADDENDUM VillDATE: May 15, 2008TO:F
- Page 169 and 170: tRkzZRDrawings1. Delete Sheet 05-SE
- Page 171 and 172: Copyright C 2 000National Society o
- Page 173 and 174: AGREEMENT... THIS AGREEMENTi betwee
- Page 175 and 176: 6.04 Seller and Buyer shall execute
- Page 177 and 178: D. The Contract Documents may only
- Page 179 and 180: ATTACHMENT ASnecificationsSection T
- Page 181 and 182:
PROPOSAL FORMPRESELECTED EQUIPMENT
- Page 183 and 184:
ARTICLE 4 - BASIS OF PROPOSAL4.01 P
- Page 185 and 186:
PARKSON CORPORATIONUnanimous Writte
- Page 187 and 188:
Hanson, RickFrom:MAHONEY770@aol.com
- Page 189 and 190:
Furt-her,.p ease advise me ifyou wi
- Page 191 and 192:
Copyright 02000National Society of
- Page 193 and 194:
AGREEMENTTHIS AGREEMENT is between(
- Page 195 and 196:
6.04 Seller and Buyer shalt execute
- Page 197 and 198:
ARTICLE 11 - MISCELLANEOUS11.01 Def
- Page 199 and 200:
ATTACHMENT ASpecificationsSection T
- Page 201 and 202:
SIEMENSCOST PROPOSALOdor Control (B
- Page 203 and 204:
SIEMENSTABLE OF CONTENTSNo.Item Des
- Page 205 and 206:
ARTICLE 1- PROPOSAL RECIPIENT1.01 T
- Page 207 and 208:
6,02 The following documents are in
- Page 209 and 210:
SIEMENSSECTION 2SIEMENS' DETAILED S
- Page 211 and 212:
SIEMENSTransfbrmer, Circuit breaker